Production information managing method of product, control center therefor and production information managing system of product
First Claim
1. A production information managing method, comprising the step of:
- comminicatably connecting an orderer of a product, a primary order-receiver producing the product based on an order from the orderer, a secondary order-receiver producing a product element constituting the product based on a order from the primary orderer, and a control center for managing a production information of the product through a network, wherein the control center sets a primary prediction information by obtaining a total production amount information and a final delivery date information of the product to be produced from the orderer, commands a preceding production of a predetermined component constituting the product element to a predetermined secondary order-receiver based on the primary prediction information, sets a final prediction information by obtaining from the orderer another total production amount information and another final delivery date information with higher accuracy than the primary prediction information and information on the primary order-receiver having received the order of the product, and formally orders the product element through the primary order-receiver or directly to the secondary order-receiver having conducted the preceding production.
1 Assignment
0 Petitions
Accused Products
Abstract
In order to efficiently utilize production information on a product among an orderer, a primary order-receiver and a secondary order-receiver to efficiently produce a product, an apparel maker, a vendor, a component factory of accessory of apparel goods etc., an assembly factory and a control center (6) are communicatably connected, the control center (6) displaying a primary prediction information including information on outline total production amount and final delivery date on a web page, commanding a preceding production of accessory component used for the apparel goods etc., displaying a final prediction information including information on the total production amount and the final delivery date with higher accuracy on the web page, designating the assembly factory, commanding transportation of the precedingly produced component and assembly of the accessory to the component factory and the assembly factory and urging to order the accessory to the vendor, the assembly factory assembling the accessory to deliver to the vendor, the vendor assembling the accessory to the apparel goods to deliver to the apparel maker.
-
Citations
20 Claims
-
1. A production information managing method, comprising the step of:
-
comminicatably connecting an orderer of a product, a primary order-receiver producing the product based on an order from the orderer, a secondary order-receiver producing a product element constituting the product based on a order from the primary orderer, and a control center for managing a production information of the product through a network, wherein the control center sets a primary prediction information by obtaining a total production amount information and a final delivery date information of the product to be produced from the orderer, commands a preceding production of a predetermined component constituting the product element to a predetermined secondary order-receiver based on the primary prediction information, sets a final prediction information by obtaining from the orderer another total production amount information and another final delivery date information with higher accuracy than the primary prediction information and information on the primary order-receiver having received the order of the product, and formally orders the product element through the primary order-receiver or directly to the secondary order-receiver having conducted the preceding production. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
-
11. A production information managing method of apparel goods, bag and shoes, comprising the steps of:
-
communicatably connecting an apparel maker, a vendor, a component factory of accessory of the apparel goods, bag, and shoes, an assembly factory thereof and a control center for managing production information of the apparel goods, bag and shoes through a network;
the control center obtaining information on a total production amount and final delivery date of the apparel goods, bag and shoes to be produced by the apparel maker, displaying a primary prediction information including the information on the total production amount and the final delivery date, and commanding a preceding production of a component of the accessory used for the apparel goods, bag and shoes to a predetermined component factory;
when the control center obtains information on another information on a total production amount and final delivery date with higher accuracy and information on the vendor, the control center displaying final prediction information including the information on the total production amount, the final delivery date and the vendor on the web page and designating at least one assembly factory near the vendor to command transport of the precedingly produced product and assembling the accessory to the component factory and the assembly factory while transmitting information on the accessory and the assembly factory to the vendor to urge order of the accessory to the assembly factory;
the assembly factory assembling and delivering the accessory to be in time for the vendor to require the accessory, the vendor incorporating the accessory into the apparel goods, bag and shoes to deliver to the apparel maker. - View Dependent Claims (13, 14, 15, 16, 17, 18)
-
-
12. A control center being communicatably connected to computers respectively installed to an orderer of a product, a primary order-receiver for producing the product based on an order from the orderer, and a secondary order-receiver for producing product element constituting the product based on an order from the primary order-receiver, the control center managing production information of the product, comprising:
-
an information input device for obtaining information on total production amount of the product to be produced, final delivery date and primary order-receiver to receive an order of the product;
a supply-and-demand managing database for storing a primary prediction information from the total production amount information and the final delivery date information at an early stage of production, and for setting a final prediction information by obtaining another total production information and another final delivery date information with higher accuracy and information on the primary order-receiver having received the order of the product; and
a supply-and-demand managing server for commanding preceding production of a predetermined component constituting the product element to a predetermined secondary order-receiver based on the primary prediction information and for formally placing an order of the product element directly or through the primary order-receiver to the secondary order-receiver having conducted the preceding production based on the final prediction information. - View Dependent Claims (19)
-
-
20. A production information managing system of apparel goods, bag and shoes, comprising:
-
a computer installed in an apparel maker, a vendor, a component factory of accessory of the apparel goods, bag and shoes and an assembly factory thereof; and
a control center for managing production information of the apparel goods, bag and shoes, the control center including a web server for supplying information on the apparel goods, bag and shoes and a production control server for managing production information of the apparel goods, bag and shoes;
wherein the production control server obtains information on a total production amount and final delivery date of the apparel goods, bag and shoes to be produced and displays a primary prediction information including the information on the apparel goods, bag and shoes and the final delivery date on the web server, commands preceding production of the accessory used for the apparel goods, bag and shoes to a predetermined component factory, and, when the information on the total production amount, the final delivery date and the vendor with higher accuracy is obtained from the apparel maker, displays a final prediction information including the higher-accuracy information on the web server, designates at least one assembly factory near the vendor, commands transport of the precedingly produced component and assembly of the accessory to the component factory and the assembly factory, and transmits information on the accessory and the assembly factory to the vendor to urge order of the accessory to the assembly factory.
-
Specification