Supply plan drafting device, method of drafting supply plan, program for drafting supply plan, and method of drafting production plan
First Claim
1. A supply plan drafting device for drafting a supply plan of an article or a service in a plurality of supply stations capable of supplying the article or the service, comprising:
- data storing means for storing unit supply man-hour data on work force and time required to supply the article or the service per unit and unit work-force-type-based cost data on cost per unit according to work force types;
required supply volume inputting means for inputting an entire required supply volume of the article or the service;
supply volume distributing means for distributing the input required supply volume to station supply volumes to be supplied from the supply stations based on a distribution parameter;
work force setting means for calculating a station supply man-hour required to supply the article or the service of the distributed station supply volume based on the unit supply man-hour data stored in the data storing means and setting a work-force-type-based work force for the calculated station supply man-hour based on a work force parameter;
cost calculating means for calculating a gross cost to supply the station supply volume from the supply stations based on the work-force-type-based work force set by the work force setting means and the unit work-force-type-based cost data stored in the data storing means;
parameter changing means for successively changing the distribution parameter and the work force parameter; and
plan setting means for selecting a revised distribution parameter and a revised work force parameter corresponding to a minimum gross cost calculated by the cost calculating means using the work-force-type-based work force that is set by the work force setting means in response to changes in the distribution parameter and in the work force parameter by the parameter changing means and setting, as a supply plan, station supply volumes that are distributed by the supply volume distributing means using the revised distribution parameter and the revised work-force-type-based work forces for the supply stations.
1 Assignment
0 Petitions
Accused Products
Abstract
A planned production volume in each of production lines, the work force required for production of the planned production volume in the production lines, a tact time, an overtime, a holiday service duty, a work force and so on are initially set based on a required production volume of an article i. The work force, the summated work forces and the planned production volume are successively changed at a predetermined interval to calculate an evaluating value as a cost required for production of the article i of the planned production volume. A set value corresponding to a minimum evaluating value is outputted as an article supply plan value. These processings make it possible to quickly draft a production plan for producing the article at low costs.
31 Citations
24 Claims
-
1. A supply plan drafting device for drafting a supply plan of an article or a service in a plurality of supply stations capable of supplying the article or the service, comprising:
-
data storing means for storing unit supply man-hour data on work force and time required to supply the article or the service per unit and unit work-force-type-based cost data on cost per unit according to work force types;
required supply volume inputting means for inputting an entire required supply volume of the article or the service;
supply volume distributing means for distributing the input required supply volume to station supply volumes to be supplied from the supply stations based on a distribution parameter;
work force setting means for calculating a station supply man-hour required to supply the article or the service of the distributed station supply volume based on the unit supply man-hour data stored in the data storing means and setting a work-force-type-based work force for the calculated station supply man-hour based on a work force parameter;
cost calculating means for calculating a gross cost to supply the station supply volume from the supply stations based on the work-force-type-based work force set by the work force setting means and the unit work-force-type-based cost data stored in the data storing means;
parameter changing means for successively changing the distribution parameter and the work force parameter; and
plan setting means for selecting a revised distribution parameter and a revised work force parameter corresponding to a minimum gross cost calculated by the cost calculating means using the work-force-type-based work force that is set by the work force setting means in response to changes in the distribution parameter and in the work force parameter by the parameter changing means and setting, as a supply plan, station supply volumes that are distributed by the supply volume distributing means using the revised distribution parameter and the revised work-force-type-based work forces for the supply stations. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 14, 15, 16, 17, 18, 19, 20, 21, 22, 24)
-
-
13. A computer-implemented supply plan drafting method of drafting a supply plan of an article or a service in a plurality of supply stations capable of supplying the article or the service, comprising the steps of:
-
(a) distributing a required supply volume of the article or the service to station supply volumes to be supplied from the supply stations while successively changing a distribution parameter;
(b) calculating a station supply man-hour required to supply the article or the service of the distributed station supply volumes based on unit supply man-hour data on work force and time required to supply the article or the service per unit and setting a work-force-type-based work force for the calculated station supply man-hour while successively changing a work force parameter;
(c) calculating a gross cost to supply the station supply volumes to be supplied from the supply stations based on the set work-force-type-based work force and unit work-force-type-based cost data on work-force-type-based cost per unit; and
(d) selecting a revised distribution parameter and a revised work force parameter corresponding to a minimum of the gross cost calculated in response to changes in the distribution parameter and the work force parameter and setting as a supply plan station supply volumes that are distributed using the revised distribution parameter and the revised work-force-type-based work forces for the supply stations.
-
-
23. A computer-implemented production plan drafting method of drafting a production plan for producing an article in a plurality of production lines every plan-executing period including a plurality of operating days, comprising:
-
a production-line-based planned production volume provisionally determining step of allocating a planned production volume during the plan-executing period to the production lines;
an operating-time setting step of calculating an operating time in each of the production lines during the plan-executing period corresponding to a provisionally determined tact time in each of the production lines and the production-line-based planned production volume, based on a relation among tact time, planned production volume and operating time in each of the production lines;
a number-of-workers calculating step of calculating the number of workers required in each of the production lines based on the set operating time;
a production-line-based personnel cost calculating step of calculating a personnel cost in each of the production lines after distribution of the calculated number of workers to worker categories with different hourly wages; and
a gross personnel cost calculating step of calculating a gross personnel cost in all the production lines by summing personnel costs in the respective production lines, wherein a minimum gross personnel cost is calculated while adjusting the number of workers distributed to the worker categories, the tact time, and the planned production volume allocated to each of the production lines.
-
Specification