×

Flexible ordering of inventory from material sources according to material requirements for manufacturing operations

  • US 20020103726A1
  • Filed: 01/31/2001
  • Published: 08/01/2002
  • Est. Priority Date: 01/31/2001
  • Status: Active Grant
First Claim
Patent Images

1. A method for scheduling delivery of material to a manufacturer with a plurality of manufacturing lines comprising:

  • determining a material requirement for an operation of at least one operation on a manufacturing line of the plurality of manufacturing lines; and

    scheduling delivery of material to meet the material requirement from an available inventory of material to the operation on the manufacturing line.

View all claims
  • 14 Assignments
Timeline View
Assignment View
    ×
    ×