Apparatus and method for determining and scheduling resources
First Claim
1. ) A system architecture for managing event driven activities, selected event driven activities generating a request stimulus, the request stimulus indicating a desire for resource activity;
- comprising;
a) a computer with memory;
b) a Resource Manager program stored within said memory, said Resource Manager receiving the request stimulus, said Resource Manager generating a request for at least one available resource;
c) a Publishing Engine program stored within said memory, said Publishing Engine in communication with said Resource Manager, said Publishing Engine receiving said request for said available resource, said Publishing Engine having at least one data structure responsive to said request for said available resource;
d) said Resource Manager generating a request for an event activity schedule; and
, e) a Scheduling Engine program stored within said memory, said Scheduling Engine in communication with said Resource Manager, said Scheduling Engine having at least one data structure responsive to said request for an event activity schedule, said data structure transforming said available resources into at least one event scheduled activity.
0 Assignments
0 Petitions
Accused Products
Abstract
A system architecture for managing event driven activities, the event driven activities are generated by a recipient'"'"'s desire for a selected resource. The recipient is in communication with a Resource Manager. The Resource Manager in receipt and responsive to the recipient'"'"'s request, generates a request for a resource allocation to satisfy the desire of the recipient for the resource. The Resource Manager formulates and transmits a request stimulus delineating the recipient desire for a selected resource allocation to a Publishing Engine. The Publishing Engine evaluates the Resource Manager'"'"'s request in view of the available resources and transmits the evaluation to the Resource Manager. The Resource Manager, in communication with the Scheduling Engine, generates a schedule activity request. The Scheduling Engine, responsive to the schedule activity request and in concert with the Publishing Engine, generates an event activity schedule reflecting the recipient'"'"'s desire for a selected resource.
6 Citations
10 Claims
-
1. ) A system architecture for managing event driven activities, selected event driven activities generating a request stimulus, the request stimulus indicating a desire for resource activity;
- comprising;
a) a computer with memory;
b) a Resource Manager program stored within said memory, said Resource Manager receiving the request stimulus, said Resource Manager generating a request for at least one available resource;
c) a Publishing Engine program stored within said memory, said Publishing Engine in communication with said Resource Manager, said Publishing Engine receiving said request for said available resource, said Publishing Engine having at least one data structure responsive to said request for said available resource;
d) said Resource Manager generating a request for an event activity schedule; and
,e) a Scheduling Engine program stored within said memory, said Scheduling Engine in communication with said Resource Manager, said Scheduling Engine having at least one data structure responsive to said request for an event activity schedule, said data structure transforming said available resources into at least one event scheduled activity. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
- comprising;
-
9. ) A method for managing event driven activities, the event driven activities generating a request stimulus, the request stimulus indicating a desire for resource activity, comprising:
-
a) receiving the request stimulus by a Resource Manager, said Resource Manager responsive to the requested stimulus and generating a request for an available resource;
b) communicating said request for an available resource to a Publishing Engine, said Publishing Engine having at least one data structure responsive to said request for said available resource;
c) communicating a request for schedule activity to a Scheduling Engine, said Scheduling Engine having at least one data structure responsive to said request for schedule activity, said data structure transforming said available resource into at least one event scheduled activity.
-
-
10. ) A database for managing event driven activities, the database having data structure means for storing resource data derived from an external source, data structure means for generating an activity schedule, and data structure means for receiving external request stimuli indicating desires for resource activity;
- comprising;
a) a plurality of Time Tube data structures stored on the database, each said Time Tube data structure having a first data field containing selected resource data, said Time Tube data structure having a second data field containing selected timing data;
b) said Time Tube data structures transforming said first data field and said second data field into an available resource data structure;
whereby a means for generating a schedule of activities is formulated from said transformed Time Tube data structures.
- comprising;
Specification