Performing predictive maintenance on equipment
First Claim
1. A method for managing maintenance of equipment, the method comprising:
- storing component data on components of an equipment;
storing worker data on maintenance personnel associated with corresponding qualifications;
associating at least one predictive maintenance factor with the corresponding component data; and
scheduling maintenance for a maintenance time period for at least one of the components based on the component data, the worker data, the associated predictive maintenance factor, and an elapsed time with respect to an installation date of at least one component.
7 Assignments
0 Petitions
Accused Products
Abstract
A data processing system stores a first database of component data on components of an equipment. The data processing system stores a second database of maintenance personnel associated with corresponding qualifications. The data processing system associates at least one predictive maintenance factor (for a component) with the corresponding component data. A scheduler schedules maintenance for a maintenance time period for at least one of the components based on the first database, the second database, the associated predictive maintenance factor, and an elapsed time with respect to an installation date of at least one component. The predictive maintenance factor may be defined by one or more of the following: a longevity estimate, a probability of failure, a financial estimate on maintenance of a component.
-
Citations
31 Claims
-
1. A method for managing maintenance of equipment, the method comprising:
-
storing component data on components of an equipment;
storing worker data on maintenance personnel associated with corresponding qualifications;
associating at least one predictive maintenance factor with the corresponding component data; and
scheduling maintenance for a maintenance time period for at least one of the components based on the component data, the worker data, the associated predictive maintenance factor, and an elapsed time with respect to an installation date of at least one component. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
-
10. A method for managing maintenance of equipment, the method comprising:
-
organizing a first database of equipment components and corresponding longevities associated with the equipment components;
organizing a second database of maintenance personnel associated with corresponding personnel locations and qualifications;
scheduling maintenance for the equipment component within a scheduled time period prior to expiration of its corresponding longevity; and
allocating the maintenance personnel and procuring the equipment component, based on the first database and the second database, consistent with the scheduled time period and availability of the maintenance personnel at an equipment location of the equipment. - View Dependent Claims (11, 12, 13, 14, 15, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31)
-
-
16. A system for managing maintenance of equipment, the system comprising:
-
a storage device for storing component data on components of an equipment;
the storage device arranged to store worker data on maintenance personnel associated with corresponding qualifications;
a predictive maintenance controller for associating at least one predictive maintenance factor with the corresponding component data; and
a scheduler for scheduling maintenance for a maintenance time period for at least one of the components based on the component data, the worker data, the associated predictive maintenance factor, and an elapsed time with respect to an installation date of at least one component.
-
Specification