1. A method of actively scheduling a time based event driven process, comprising:
- receiving status update information;
adapting an initial schedule of the time based event driven process based on the status update information to thereby generate an adapted schedule; and
modifying the adapted schedule based on historical information to thereby generate a modified schedule for the time based event driven process.
1 Assignment
0 Petitions
Accused Products
Abstract
An apparatus, system and method for active scheduling of event-driven long running processes are provided. The apparatus, system and method receive update information indicating a change in status of a subject of the active scheduling. Based on this changed status and stored scheduling rules, an adapted schedule is generated to accommodate the change in status. The adapted schedule is further modified based on historical information to compensate for historically predicted events that may conflict with events in the adapted schedule.
30 Citations
30 Claims
-
1. A method of actively scheduling a time based event driven process, comprising:
-
receiving status update information;
adapting an initial schedule of the time based event driven process based on the status update information to thereby generate an adapted schedule; and
modifying the adapted schedule based on historical information to thereby generate a modified schedule for the time based event driven process. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10)
-
-
11. A computer program product in a computer readable medium for actively scheduling a time based event driven process, comprising:
-
first instructions for receiving status update information;
second instructions for adapting an initial schedule of the time based event driven process based on the status update information to thereby generate an adapted schedule; and
third instructions for modifying the adapted schedule based on historical information to thereby generate a modified schedule for the time based event driven process. - View Dependent Claims (12, 13, 14, 15, 16, 17, 18, 19, 20)
-
-
21. An apparatus for actively scheduling a time based event driven process, comprising:
-
a remote device interface that receiving status update information; and
a controller coupled to the remote device interface, wherein the controller adapts an initial schedule of the time based event driven process based on the status update information to thereby generate an adapted schedule, and modifies the adapted schedule based on historical information to thereby generate a modified schedule for the time based event driven process. - View Dependent Claims (22, 23, 24, 25, 26, 27, 28, 29, 30)
-