Power management installation in an aircraft
First Claim
1. A power management installation in an aircraft including a power distribution network and at least two subscribers connected to the power distribution network, each subscriber having a set of loads, consuming electric power and local means controlling the loads, wherein the power management installation comprises:
- (a) means for allocating, to each subscriber, a total maximum power for all the loads of the subscriber;
(b) means for evaluating, for each subscriber, the total electric power consumed; and
(c) means for modifying the conditions for controlling the loads of each subscriber, according to the controlled loads of the subscriber, the total electric power consumed by the subscriber and the total maximum power allocated to the subscriber.
4 Assignments
0 Petitions
Accused Products
Abstract
A power management installation in an aircraft includes a power distribution network and at least two subscribers, each subscriber having loads consuming electric power and local control means. The power management installation has means for allocating, to each subscriber, a maximum total power for all the loads; means of evaluating for each subscriber, the total electric power consumed; and means for modifying the conditions for controlling the loads of each subscriber, according to the control loads of the subscriber, the total electric power consumed by the subscriber and the maximum total power allocated to the subscriber.
-
Citations
11 Claims
-
1. A power management installation in an aircraft including a power distribution network and at least two subscribers connected to the power distribution network, each subscriber having a set of loads, consuming electric power and local means controlling the loads, wherein the power management installation comprises:
-
(a) means for allocating, to each subscriber, a total maximum power for all the loads of the subscriber;
(b) means for evaluating, for each subscriber, the total electric power consumed; and
(c) means for modifying the conditions for controlling the loads of each subscriber, according to the controlled loads of the subscriber, the total electric power consumed by the subscriber and the total maximum power allocated to the subscriber. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11)
-
Specification