×

Construction scheduling system

  • US 20030018507A1
  • Filed: 03/13/2002
  • Published: 01/23/2003
  • Est. Priority Date: 03/13/2001
  • Status: Abandoned Application
First Claim
Patent Images

1. A system for scheduling a plurality of simultaneous construction projects, the system comprising:

  • at least one server computer connected to a computer network;

    software capable of scheduling multiple events among a plurality of construction projects, said software controlling said at least one server computer; and

    a plurality of field communication devices each device of said plurality having a display and being capable of wirelessly connecting through the computer network for interactively communicating with said at least one server computer through security controlled access thereto.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×