Construction scheduling system
First Claim
1. A system for scheduling a plurality of simultaneous construction projects, the system comprising:
- at least one server computer connected to a computer network;
software capable of scheduling multiple events among a plurality of construction projects, said software controlling said at least one server computer; and
a plurality of field communication devices each device of said plurality having a display and being capable of wirelessly connecting through the computer network for interactively communicating with said at least one server computer through security controlled access thereto.
1 Assignment
0 Petitions
Accused Products
Abstract
A system and process for scheduling a plurality of simultaneous construction projects includes at least one server computer connected to a computer network, software capable of scheduling multiple events among a plurality of construction projects, said software controlling said at least one server computer, and a plurality of field communication devices each device of said plurality having a display and being capable of wirelessly connecting through the computer network for interactively communicating with said at least one server computer through a security controlled access including a unique identifier corresponding to each individual field communication device. Field communication devices according to the invention preferably include geographic positioning capability to allow tracking of the device.
-
Citations
35 Claims
-
1. A system for scheduling a plurality of simultaneous construction projects, the system comprising:
-
at least one server computer connected to a computer network;
software capable of scheduling multiple events among a plurality of construction projects, said software controlling said at least one server computer; and
a plurality of field communication devices each device of said plurality having a display and being capable of wirelessly connecting through the computer network for interactively communicating with said at least one server computer through security controlled access thereto. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8)
-
-
9. A system for scheduling a plurality of simultaneous construction projects, the system comprising:
-
at least one server computer connected to a computer network;
software capable of scheduling multiple events among a plurality of construction projects, said software controlling said at least one server computer; and
a plurality of field communication devices each device of said plurality having a display and being capable of wirelessly connecting through the computer network for interactively communicating with said at least one server computer through a security controlled access including a unique identifier corresponding to each individual field communication device. - View Dependent Claims (10, 11, 12, 13, 14, 15, 16, 18, 19, 20, 21, 22, 23, 24, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35)
-
-
17. A system for scheduling a plurality of simultaneous construction projects, the system comprising:
-
at least one server computer connected to a computer network;
software capable of scheduling multiple events among a plurality of construction projects, said software controlling said at least one server computer; and
a plurality of field communication devices each device of said plurality having a display, being capable of wirelessly connecting through the computer network for interactively communicating with said at least one server computer through security controlled access thereto, and including geographic positioning capability so as to communicate position to said at least one server computer.
-
-
25. A process for scheduling a plurality of construction projects, the method comprising:
-
creating a plurality of construction schedules in a database stored in a server computer, each construction schedule of the plurality corresponding to an individual construction project;
accessing the database by security controlled communication through a computer network;
updating information for individual construction schedule records in the database;
generating a status report for a predetermined construction schedule by processing information in the database to thereby monitor progress of the corresponding construction project.
-