×

Loading and unloading plant in a sea or river port

  • US 20030047529A1
  • Filed: 09/04/2002
  • Published: 03/13/2003
  • Est. Priority Date: 01/19/2000
  • Status: Abandoned Application
First Claim
Patent Images

1. A loading and unloading plant in a sea or river port, in particular for ISO containers, comprising a container storage facility which is located along a quay and consists of individual line-type storage modules and at least one loading device for handling loads to and from a vessel on the quay, characterized in that the loading plant for the loading and unloading consists of at least one mobile harbor crane (5), whose load jib extends into the area of at least one transfer point (6) which is provided within a container storage facility (7) consisting of a number of storage modules (9, 9.1, 9.2) with a number of container rows that depends on the width of the module and forms an interface between the mobile harbor crane (5) and the storage modules (9, 9.1, 9.2) of the container storage facility (7).

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×