Contingency planning in a scheduling process
First Claim
1. A method of scheduling tasks to be performed by means of a plurality of resources, comprising:
- providing schedule data (26, 42-45) corresponding to schedules of the tasks (11) that individual ones of the resources are to carry out, prepared from task data (4) concerning the tasks to be carried out and resource data (6) concerning characteristics of resources available to carry out the tasks over a given period, together with contingency values (C) associated with the scheduled tasks for the individual resources.
7 Assignments
0 Petitions
Accused Products
Abstract
Tasks m such as repair jobs on a telecommunications system, that are to be performed by a plurality of resources such as field engineers (E), at different locations in a geographical area (2), are scheduled by means of a scheduler (10) at a work manager server (5). The scheduler provides schedule data (11) corresponding to schedules of the tasks that individual ones of the resources are to carry out, from task data (4) concerning the tasks to be carried out and resource data (6) concerning characteristics of resources available to carry out the tasks over a given period. The scheduled tasks are provided with associated contingency values (C) which are each computed as a function of the difference between the time that a task is scheduled to start and the latest start time that is feasible for the task . The schedule data (11) is downloaded to a workstation (7). The downloaded data is displayed on a Gantt Chart and the task blocks on the display are colour coded according to their contingency values (C) to give a visual indication of their values.
26 Citations
7 Claims
-
1. A method of scheduling tasks to be performed by means of a plurality of resources, comprising:
providing schedule data (26, 42-45) corresponding to schedules of the tasks (11) that individual ones of the resources are to carry out, prepared from task data (4) concerning the tasks to be carried out and resource data (6) concerning characteristics of resources available to carry out the tasks over a given period, together with contingency values (C) associated with the scheduled tasks for the individual resources. - View Dependent Claims (2, 3, 4, 5, 6)
-
7. Computer software to be run on data processing apparatus for use in scheduling tasks to be performed by a plurality of resources, the software including program instructions to produce schedule data (26, 42-45) corresponding to schedules of the tasks (11) that individual ones of the resources are to carry out, the schedule data having been prepared from task data (4) concerning the tasks to be carried out and resource data (6) concerning characteristics of resources available to carry out the tasks over a given period, and to produce with contingency values (C) associated with the scheduled tasks for the individual engineers.
Specification