1. A method of assigning resources within a network element within which a traffic termination point or AAL2 termination point has been established, the method including the steps of:

  • accepting a connection request via the network element;

    ascertaining whether available resources have sufficient capacity to establish the requested connection;

    in the event that there is sufficient capacity, ascertaining whether the termination points defined in relation to the available resources fragments the resources such that the connection cannot be established;

    in the event that the resources are so fragmented, reallocating one or more of the termination points, without breaking the connection to which they relate, thereby defragmenting the resources sufficiently that the requested connection can be established.