×

Management of decentralized production and centralized material distribution

  • US 20030126043A1
  • Filed: 01/03/2002
  • Published: 07/03/2003
  • Est. Priority Date: 12/24/2001
  • Status: Abandoned Application
First Claim
Patent Images

1. A management method for decentralized productions and centralized materials distribution relates to a method that employs to proceed the operation of materials distribution to pre-defined facilities for productions through an Enterprise Resource Planning (ERP) server of an enterprise end on the material management system in the manufacturing industry. The Enterprise Resource Planning (ERP) server is linked to an information intermediary through a network backbone for transferring updated information to a supplier end to complete timely material delivery. The disclosed method at least includes the following steps:

  • Receiving at least one bill of material (BOM) through the Enterprise Resource Planning (ERP) server;

    Integrating the bill of material (BOM) through the Enterprise Resource Planning (ERP) server;

    Distributing materials to specified facilities through the Enterprise Resource Planning (ERP) server;

    Purchasing materials through the material requirements planning server;

    Transferring data to the supplier through a specified data transmission format and method; and

    Delivering materials as contracted by the supplier.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×