×

Real time asset optimization

  • US 20030130755A1
  • Filed: 12/26/2001
  • Published: 07/10/2003
  • Est. Priority Date: 12/26/2001
  • Status: Active Grant
First Claim
Patent Images

1. A method for optimizing the maintenance of assets and production comprising the steps of:

  • a) receiving at least one maintenance trigger indicative that a maintenance action is or may be required for at least one of said assets;

    b) receiving at least one order for production of a certain quantity of a certain product; and

    c) using a predetermined criteria to evaluate said at least one received maintenance trigger and said production order to propose therefrom one or more solutions for jointly scheduling said maintenance action and said at least one production order.

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×