1. A materials management system, comprising:
- a remote operation center that coordinates at least one portion of the materials management system, and that receives at least one attribute of at least one material flow item, wherein the at least one material flow item enters the at least one portion of the materials management system, and wherein said remote operation center updates the at least one attribute to at least one updated attribute to reflect entry of the at least one material flow item into the at least one portion; and
at least one receiving station in the at least one portion that transmits the at least one attribute to the remote operation center, and that receives the at least one update attribute from the remote operation center, over an interconnection external to the at least one portion;
wherein the at least one attribute and the at least one updated attribute are reconciled at the receiving station.
0 Assignments
0 Petitions
Accused Products
Abstract
A materials management system, and a method of controlling a materials management flow including at least one inventoried item, are disclosed. The materials management system may include a remote operation center that provides a coordination of at least one portion of the materials management system, and that receives at least one attribute of at least one material flow item in the at least one portion of the materials management system, and at least one receiving station that transmits the at least one attribute to the remote operation center, and that receives the at least one update attribute from the remote operation center, over an external interconnection. The method includes the steps of scanning the at least one inventoried item upon entry into the materials management system at a first local receiving station, scanning the at least one inventoried item at an at least one secondary receiving station prior to delivery of the item, scanning the at least one inventoried item at at least one tertiary receiving station upon delivery of the item, scanning the at least one least one tertiary receiving station upon delivery of the item, and reconciling placement of the item at at least one of the at least one secondary receiving station and the at least one tertiary receiving station at a remote operation center externally connected to the first local receiving station, the at least one secondary receiving station, and the at least one tertiary receiving station.
-
Citations
19 Claims
-
1. A materials management system, comprising:
-
a remote operation center that coordinates at least one portion of the materials management system, and that receives at least one attribute of at least one material flow item, wherein the at least one material flow item enters the at least one portion of the materials management system, and wherein said remote operation center updates the at least one attribute to at least one updated attribute to reflect entry of the at least one material flow item into the at least one portion; and
at least one receiving station in the at least one portion that transmits the at least one attribute to the remote operation center, and that receives the at least one update attribute from the remote operation center, over an interconnection external to the at least one portion;
wherein the at least one attribute and the at least one updated attribute are reconciled at the receiving station. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13)
-
-
14. A method of controlling a materials management flow including at least one inventoried item, comprising:
-
scanning the at least one inventoried item upon entry into the materials management flow at a first local receiving station;
scanning the at least one inventoried item at at least one secondary receiving station prior to delivery of the item;
scanning the at least one inventoried item at at least one tertiary receiving station upon delivery of the item;
scanning the at least one least one tertiary receiving station upon delivery of the item; and
reconciling placement of the item at at least one of the at least one secondary receiving station, and the at least one tertiary receiving station, at a remote operation center externally connected to the first local receiving station, the at least one secondary receiving station, and the at least one tertiary receiving station.
-
-
15. A method of controlling a material flow, comprising:
-
coordinating of at least one portion of the materials management system at a remote operation center;
externally transmitting at least one attribute to the remote operation center from at least one receiving station;
receiving the at least one attribute of at least one material flow item in the at least one portion of the materials management system at the remote operation center;
updating the at least one attribute to at least one updated attribute at the remote operation center;
externally transmitting the at least one update attribute from the remote operation center to the at least one receiving station; and
reconciling the at least one attribute and the at least one updated attribute.
-
-
16. A method of controlling materials in a material flow, in accordance with at least one updated attribute of each of the controlled materials, comprising:
-
receiving the at least one updated attribute at an at least one local receiving station, in accordance with an entry of the at least one updated attribute;
transmitting an at least one local attribute, from the at least one local receiving station, to a remote operation center, responsively to said receiving the at least one updated attribute, wherein the at least one updated attribute, and the at least one local attribute at the local receiving station, and a receipt of the transmitted at least one local attribute at the remote operation center, are substantially simultaneously reviewable at the at least one local receiving station. - View Dependent Claims (17, 18, 19)
-