×

Management system for construction machines

  • US 20030193406A1
  • Filed: 05/02/2003
  • Published: 10/16/2003
  • Est. Priority Date: 08/31/1998
  • Status: Active Grant
First Claim
Patent Images

1. A management system for a construction machine, comprising:

  • a memory means for storing a management information of the construction machine, said management information being operating information relating to time of operation of the construction machine;

    a communication means for carrying out transmission and reception of said management information of the construction machine with management center for managing said construction machine using said management information;

    a read-out means for reading out said operating information stored in the memory means for the purpose of transmitting said operating information to the management center;

    a discrimination means for discriminating if said read-out means fulfills predetermined readable conditions of the operating information stored in the memory means; and

    an anti-theft device adapted to cause the construction machine to stop operation in case of receipt by the anti-theft device of a control information relating to an operation stop signal transmitted from the management center.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×