Please download the dossier by clicking on the dossier button x
×

Wind farm

  • US 20040056486A1
  • Filed: 09/19/2003
  • Published: 03/25/2004
  • Est. Priority Date: 10/17/2000
  • Status: Active Grant
First Claim
Patent Images

1. Wind farm comprising at least two wind turbines, characterised by a cable connection (10) spanning at least two wind turbines (12) at a predetermined height, and a gondola (14) disposed on said cable connection.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×