Device arrangement structure for hybrid construction equipment
First Claim
1. A device arrangement structure for hybrid construction equipment in which a hydraulic pump is driven with use of an engine and a generator motor in combination, and an inflow of discharge oil of said hydraulic pump to hydraulic actuators is controlled to drive at least one working machine, wherein said hydraulic pump is connected to said engine via a first power take-off;
- and wherein i) a regenerative motor which is driven by return oil from said hydraulic actuators and regenerates inertia energy or potential energy of said working machine to drive said hydraulic pump, ii) said generator motor, which is driven as a generator with surplus torque when regeneration torque of said regenerative motor is larger than driving torque of said hydraulic pump, and is driven as an electric motor to assist with drive of said hydraulic pump, are provided in parallel with said hydraulic pump via said first power take-off.
1 Assignment
0 Petitions
Accused Products
Abstract
A device arrangement structure for hybrid construction equipment capable of reducing devices of a charging system in size is provided. For this purpose, in the device arrangement structure: a hydraulic pump (47) is connected to an engine (41) via a first power take-off (46); and a regenerative motor (59), which is regenerated by return oil from hydraulic actuators (10a, 10b), and a generator motor (55), which assists an engine as an electric motor to drive hydraulic pump and generates power with surplus torque of the regenerative motor, are provided in parallel with the hydraulic pump via the first power take-off.
38 Citations
4 Claims
-
1. A device arrangement structure for hybrid construction equipment in which a hydraulic pump is driven with use of an engine and a generator motor in combination, and an inflow of discharge oil of said hydraulic pump to hydraulic actuators is controlled to drive at least one working machine,
wherein said hydraulic pump is connected to said engine via a first power take-off; - and
wherein i) a regenerative motor which is driven by return oil from said hydraulic actuators and regenerates inertia energy or potential energy of said working machine to drive said hydraulic pump, ii) said generator motor, which is driven as a generator with surplus torque when regeneration torque of said regenerative motor is larger than driving torque of said hydraulic pump, and is driven as an electric motor to assist with drive of said hydraulic pump, are provided in parallel with said hydraulic pump via said first power take-off.
- and
-
2. A device arrangement structure for hybrid construction equipment in which a hydraulic pump is driven with use of an engine and a generator motor in combination, and an inflow of discharge oil of said hydraulic pump to hydraulic actuators is controlled to drive at least one working machine, comprising:
-
devices of a high pressure hydraulic system including i) said hydraulic pump connected to said engine via a first power take-off, ii) a hydraulic valve for controlling an inflow of discharge oil to said hydraulic actuators, iii) a regenerative motor which is connected to said hydraulic pump via said first power take-off, driven by return oil from said hydraulic actuators, and regenerates inertia energy or potential energy of said working machine to drive said hydraulic pump, and iv) a working fluid tank for draining the return oil from said hydraulic actuators via said regenerative motor, wherein devices of a charging system including a) said generator motor which is driven as a generator with surplus torque when regeneration torque of said regenerative motor is larger than driving torque of said hydraulic pump, and is driven as an electric motor to assist with drive of said hydraulic pump, b) a capacitor device which is charged with generation electric power of said generator motor as the generator, and supplies driving electric power as the electric motor, and c) an inverter which controls charge of said generator motor into said capacitor device, and drive of said generator motor as the electric motor, are placed separately from said devices of the high pressure hydraulic system. - View Dependent Claims (3, 4)
-
Specification