Please download the dossier by clicking on the dossier button x
×

Method for operating a steam power installation and corresponding steam power installation

  • US 20040105518A1
  • Filed: 09/12/2003
  • Published: 06/03/2004
  • Est. Priority Date: 03/15/2001
  • Status: Active Grant
First Claim
Patent Images

1. A method for operating a steam power installation (1), whereby steam (D) generated in a boiler (3) is condensed in a condenser (7) after flowing through at least one turbine (5), and the condensate (K) obtained is preheated and fed back to the boiler (3) as feed-water (S), characterized in that the condensate (K) is divided for condensate preheating into a first partial flow (K1) and a second partial flow (K2), only the first partial flow (K1) being preheated, and the second partial flow (K2) being re-mixed with the preheated first partial flow (K1).

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×