×

Automatic employment of resource load information with one or more policies to automatically determine whether to decrease one or more loads

  • US 20040111513A1
  • Filed: 12/04/2002
  • Published: 06/10/2004
  • Est. Priority Date: 12/04/2002
  • Status: Abandoned Application
First Claim
Patent Images

1. An apparatus, comprising:

  • one or more policies that comprise one or more dynamically-updateable policies and zero or more fixed policies;

    a director component that automatically employs information about one or more of a plurality of loads on a resource in conjunction with the one or more policies to automatically determine whether to decrease one or more loads of the one or more of the plurality of loads on the resource, wherein upon determination by the director component to decrease the one or more loads the director component automatically prepares an instruction to decrease the one or more loads; and

    a control component that, upon receipt of the instruction from the director component, automatically decreases the one or more loads on the resource;

    wherein the one or more dynamically-updateable policies are changeable contemporaneously with active operation of the director component with the control component.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×