×

Flexible scheduling of maintenance tasks in a maintenance plan

  • US 20040122723A1
  • Filed: 12/24/2002
  • Published: 06/24/2004
  • Est. Priority Date: 12/24/2002
  • Status: Abandoned Application
First Claim
Patent Images

1. A method comprising:

  • defining a first planning object having a first value associated with an out of compliance parameter, a second value associated with a maximum utilization parameter, the second value being less than the first value, a third value associated with a minimum utilization parameter, the third value being less than the second value, and a fourth value associated with a target utilization value, the fourth value being less than the second value and greater than the third value and indicating when a maintenance demand is due; and

    determining whether a slot exists for the maintenance demand where the slot comprises a start date between the second and third values, inclusive.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×