Blow out preventer handling system

  • US 20040134666A1
  • Filed: 01/13/2003
  • Published: 07/15/2004
  • Est. Priority Date: 01/13/2003
  • Status: Active Grant
First Claim
Patent Images

1. A process to transport a blow out preventer for a drilling or workover rig having a drawworks between a storage area and a use position over a wellbore, which process comprises the steps of:

  • connecting an upper connector end of an elongated running tool to said drawworks of said drilling rig;

    moving said elongated running tool into position parallel to said wellbore using said drawworks of said drilling rig;

    lowering said running tool so that a stab connection is made between a lower connector end of said running tool and said blow out preventer; and

    moving said blow out preventer over and in alignment with said wellbore.