Battery charger capable of indicating time remaining to achieve full charge
First Claim
1. A battery charger for charging a secondary battery, comprising:
- a battery voltage detector that detects a voltage of the secondary battery and outputs a voltage signal indicative of the voltage of the secondary battery;
a battery temperature sensor that detects a temperature of the secondary battery and outputs a temperature signal indicative of the temperature of the secondary battery;
a controller that determines an estimated time level from among a plurality of different estimated time levels that indicate how much time is required for the secondary battery to reach a full charge based on the temperature signal and the voltage signal both output when the secondary battery is at a precharge state; and
a display that indicates information regarding the estimated time level based on determination made by the controller.
2 Assignments
0 Petitions
Accused Products
Abstract
A battery charger includes a battery voltage detector for detecting the voltage of a secondary battery and a battery temperature sensor for detecting the temperature of the secondary battery. A controller determines the voltage of the secondary battery prior to beginning the charging process based on output from the battery voltage detector. The controller also determines the charging level from among a plurality of levels that indicate how much time is required for the secondary battery to reach a full charge, based on the determined voltage of the secondary battery and output from the battery temperature sensor. A display is provided for displaying the charging level that indicates the time remaining to achieve a full charge.
-
Citations
14 Claims
-
1. A battery charger for charging a secondary battery, comprising:
-
a battery voltage detector that detects a voltage of the secondary battery and outputs a voltage signal indicative of the voltage of the secondary battery;
a battery temperature sensor that detects a temperature of the secondary battery and outputs a temperature signal indicative of the temperature of the secondary battery;
a controller that determines an estimated time level from among a plurality of different estimated time levels that indicate how much time is required for the secondary battery to reach a full charge based on the temperature signal and the voltage signal both output when the secondary battery is at a precharge state; and
a display that indicates information regarding the estimated time level based on determination made by the controller. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11)
-
-
12. A battery charger for charging a secondary battery, comprising:
-
a battery temperature sensor that detects a temperature of the secondary battery and outputs a temperature signal indicative of the temperature of the secondary battery;
a controller that calculates a temperature gradient within a predetermined time interval based on the temperature signal, determines whether the secondary battery is on the verge of a full charge or the secondary battery has reached a full charge based on the temperature gradient, and further determines an estimated time level from among a plurality of different estimated time levels that indicate how much time is required for the secondary battery to reach a full charge based on whether the secondary battery is on the verge of the full charge or the secondary battery has reached the full charge; and
a display that indicates information regarding the estimated time level based on determination regarding the estimated time level made by the controller, wherein when the controller determines that the secondary battery is on the verge of the full charge, the controller controls the display to indicate an estimated time level indicative of a minimum time required for the secondary battery to reach the full charge.
-
-
13. A battery charger for charging a secondary battery, comprising:
-
a battery temperature sensor that detects a temperature of the secondary battery and outputs a temperature signal indicative of the temperature of the secondary battery;
a controller that calculates a temperature rise of the secondary battery during charging based on the temperature signal, determines whether the secondary battery is on the verge of a full charge or the secondary battery has reached a full charge based on the temperature rise, and further determines an estimated time level from among a plurality of different estimated time levels that indicate how much time is required for the secondary battery to reach a full charge based on whether the secondary battery is on the verge of the full charge or the secondary battery has reached the full charge; and
a display that indicates information regarding the estimated time level based on determination regarding the estimated time level made by the controller, wherein when the controller determines that the secondary battery is on the verge of the full charge, the controller controls the display to indicate an estimated time level indicative of a minimum time required for the secondary battery to reach the full charge.
-
-
14. A battery charger for charging a secondary battery, comprising:
-
a battery voltage detector that detects a voltage of the secondary battery and outputs a voltage signal indicative of the voltage of the secondary battery;
a controller that calculates a voltage gradient within a predetermined time interval based on the voltage signal, determines whether the secondary battery is on the verge of a full charge or the secondary battery has reached a full charge based on the voltage gradient, and further determines an estimated time level from among a plurality of different estimated time levels that indicate how much time is required for the secondary battery to reach a full charge based on whether the secondary battery is on the verge of the full charge or the secondary battery has reached the full charge; and
a display that indicates information regarding the estimated time level based on determination regarding the estimated time level made by the controller, wherein when the controller determines that the secondary battery is on the verge of the full charge, the controller controls the display to indicate an estimated time level indicative of a minimum time required for the secondary battery to reach the full charge.
-
Specification