×

Material control system

  • US 20040158396A1
  • Filed: 10/08/2003
  • Published: 08/12/2004
  • Est. Priority Date: 02/10/2003
  • Status: Abandoned Application
First Claim
Patent Images

1. A material control system (MCS) to select an optimum transport route by calculating a prospective transport time between a source node and a destination node, comprising:

  • a transport order manager to receive and manage layout information, and real-time job information of a load and a waiting job number of a storehouse according to respective unit links;

    an optimum route generating part to calculate the prospective transport time by receiving the layout information and the real-time job information in a predetermined period of time from the transport order manager and by modeling the information, and to select a transport route having a minimum prospective transport time as the optimum transport route.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×