×

Predictive and preemptive planning and scheduling for different jop priorities system and method

  • US 20040225394A1
  • Filed: 04/28/2003
  • Published: 11/11/2004
  • Est. Priority Date: 04/28/2003
  • Status: Active Grant
First Claim
Patent Images

1. A computer controlled system for configuration-specific reprioritization of jobs in a reconfigurable production system having a plurality of modules with a plurality of alternative capabilities for processing work units, the system comprising:

  • a system controller;

    at least one planning function for planning utilization of selected module capabilities in the production of jobs having not less than one work unit, wherein said module capabilities include the relative costs of said module capabilities; and

    at least one scheduling function for scheduling utilization of said selected module capabilities in the production of said jobs having not less than one work unit.

View all claims
  • 3 Assignments
Timeline View
Assignment View
    ×
    ×