System and method of work management
First Claim
Patent Images
1. A method of managing construction work, the method comprising:
- creating a work request regarding a building in a database in communication with an owner user interface and a builder user interface;
assigning the work request created in the database to a trade contractor to complete the work request;
tracking the status of the work request in the database; and
storing the work request, the trade contractor, and the status in the database for subsequent access via at least one of the owner user interface and the builder user interface.
1 Assignment
0 Petitions
Accused Products
Abstract
A method of managing construction work including creating a work request regarding a building in a database coupled to an owner user interface and a builder user interface, assigning the work request created in the database to a trade contractor to complete the work request, and tracking the status of the work request in the database. The method further includes storing the work request, the trade contractor, and the status in the database for subsequent access via at least one of the owner user interface and the builder user interface.
64 Citations
37 Claims
-
1. A method of managing construction work, the method comprising:
-
creating a work request regarding a building in a database in communication with an owner user interface and a builder user interface;
assigning the work request created in the database to a trade contractor to complete the work request;
tracking the status of the work request in the database; and
storing the work request, the trade contractor, and the status in the database for subsequent access via at least one of the owner user interface and the builder user interface. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12)
-
-
13. A method of managing construction work, the method comprising:
-
creating a work request regarding a building in a database coupled to an owner interface and a builder interface;
assigning the work request created in the database to a trade contractor to complete the work request;
tracking the status of the work request in the database reporting the work request as complete to the database;
storing the work request, the trade contractor, the status, and the report of completion in the database for subsequent access via at least one of the owner interface and the builder interface. - View Dependent Claims (14, 15, 16, 17, 18, 19, 20, 21, 22)
-
-
23. A construction work management system comprising:
-
a database storing a builder warranty, work order information relating to the builder warranty, the work order information including a work request, a trade contractor assigned to the work request, and the status of the work request; and
a network communication link coupled with the database;
wherein the database is configured to selectively interface with at least one of an owner and a builder via the network communication link. - View Dependent Claims (24, 25, 26, 27, 28, 29, 30, 31, 32, 33)
-
-
34. A computer readable medium having computer-executable instructions for performing a method of managing construction work information comprising:
-
creating a work request regarding a building in a database coupled to an owner and a builder;
assigning the work request created in the database to a trade contractor to complete the work request; and
tracking the status of the work request in the database. - View Dependent Claims (35, 36)
-
-
37. A method of managing construction work, the method comprising:
-
creating a work request regarding a building in a database coupled to an owner user interface, a builder user interface, a trade contractor user interface, and an administrator user interface;
determining if the work request falls within a builder'"'"'s limited warranty;
assigning the work request created in the database to a trade contractor to complete the work request, including scheduling a time for the trade contractor to complete the work request;
tracking the status of the work request in the database;
reporting the work request as complete to the database;
storing the work request, the trade contractor, the scheduled time, the status, and the report of completion in the database for subsequent access via at least one of the owner user interface, the builder user interface, the trade contractor user interface, and the administrator user interface;
logging records of communications between at least two of the owner user interface, the builder user interface, the trade contractor user interface, and the administrator user interface in the database; and
generating empirical data based at least in part upon the tracked status of the work request.
-