Early hydrocarbon production system

  • US 20040238176A1
  • Filed: 04/07/2004
  • Published: 12/02/2004
  • Est. Priority Date: 10/12/2001
  • Status: Abandoned Application
First Claim
Patent Images

1. A method of exploiting a subsea hydrocarbon reserve, comprising the steps of drilling a first well (4) from a floating drilling vessel (2), establishing a production riser (10) for transferring production fluid from the first well (4) to the drilling vessel or production fluid reception means (18) closely associated with the vessel, and extracting production fluid from the first well (4) while drilling one or more further wells (20) from the drilling vessel (2), and characterised by the steps of:

  • (i) processing the production fluid with processing means (24) installed on the drilling vessel (2);

    (ii) subsequently installing the processing means (24) on the seabed; and

    (iii) carrying out subsea processing of production fluid from the wells (4,4

    ,20) by using the processing means (24).

View all claims