Early hydrocarbon production system
First Claim
1. A method of exploiting a subsea hydrocarbon reserve, comprising the steps of drilling a first well (4) from a floating drilling vessel (2), establishing a production riser (10) for transferring production fluid from the first well (4) to the drilling vessel or production fluid reception means (18) closely associated with the vessel, and extracting production fluid from the first well (4) while drilling one or more further wells (20) from the drilling vessel (2), and characterised by the steps of:
- (i) processing the production fluid with processing means (24) installed on the drilling vessel (2);
(ii) subsequently installing the processing means (24) on the seabed; and
(iii) carrying out subsea processing of production fluid from the wells (4,4′
,20) by using the processing means (24).
1 Assignment
0 Petitions
Accused Products
Abstract
A subsea hydrocarbon reserve is exploited by intially drilling a first well (4) from a floating drilling vessel (2). A tree (8) is then installed on the well (4) and a production riser (10) is established between the well and the vessel for transferring production fluid from the first well (4) to the vessel (2) from where an off-loading hose (12) conveys the production fluid to a tanker (18). Production fluid is then extracted from the first well (4) via the production riser (10) which is of sufficient flexibility and length to permit the drilling vessel (2) to move between appropriate locations to drill further wells (4′, 20).
24 Citations
13 Claims
-
1. A method of exploiting a subsea hydrocarbon reserve, comprising the steps of drilling a first well (4) from a floating drilling vessel (2), establishing a production riser (10) for transferring production fluid from the first well (4) to the drilling vessel or production fluid reception means (18) closely associated with the vessel, and extracting production fluid from the first well (4) while drilling one or more further wells (20) from the drilling vessel (2), and characterised by the steps of:
-
(i) processing the production fluid with processing means (24) installed on the drilling vessel (2);
(ii) subsequently installing the processing means (24) on the seabed; and
(iii) carrying out subsea processing of production fluid from the wells (4,4′
,20) by using the processing means (24). - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13)
-
Specification