×

Method and system for calculating risk components associated with the consumption of an indirect procurement commodity

  • US 20040260613A1
  • Filed: 06/18/2003
  • Published: 12/23/2004
  • Est. Priority Date: 06/18/2003
  • Status: Abandoned Application
First Claim
Patent Images

1. A method for calculating risk components associated with the consumption of an indirect procurement commodity comprising:

  • receiving consumption data related to an indirect procurement commodity;

    establishing a volume of the indirect procurement commodity to be consumed during a future predetermined duration and time period based on the consumption data; and

    calculating at least one risk component wherein the at least one risk component is associated with the volume of the indirect procurement commodity to be consumed during a future predetermined period.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×