Performing predictive maintenance based on a predictive maintenance target
First Claim
1. A method of performing predictive maintenance on an item of equipment, the method comprising the steps of:
- establishing a desired configuration of the item of equipment based on a predictive maintenance target of the item of equipment, wherein the predictive maintenance target includes at least one of a physical configuration objective, a functional configuration objective, a logical configuration objective, and an operational configuration objective;
evaluating an actual configuration of the item of equipment;
determining if the actual configuration complies with the desired configuration; and
planning an upgrade requirement for upgrading the actual configuration to the desired configuration if the actual configuration is noncompliant.
3 Assignments
0 Petitions
Accused Products
Abstract
A method and system for performing predictive maintenance on an item of equipment comprises establishing a desired configuration of the item of equipment based on a predictive maintenance target of the item of equipment. The predictive maintenance target may include at least one of a functional configuration objective, a logical configuration objective, and an operational configuration objective. An actual configuration of the item of equipment is monitored. It is determined if the actual configuration complies with the desired configuration. An upgrade requirement is planned for upgrading the actual configuration to the desired configuration if the actual configuration is non-compliant.
80 Citations
20 Claims
-
1. A method of performing predictive maintenance on an item of equipment, the method comprising the steps of:
-
establishing a desired configuration of the item of equipment based on a predictive maintenance target of the item of equipment, wherein the predictive maintenance target includes at least one of a physical configuration objective, a functional configuration objective, a logical configuration objective, and an operational configuration objective;
evaluating an actual configuration of the item of equipment;
determining if the actual configuration complies with the desired configuration; and
planning an upgrade requirement for upgrading the actual configuration to the desired configuration if the actual configuration is noncompliant. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11)
-
-
12. A system for performing predictive maintenance on an item of equipment, the system comprising:
-
a desired configuration database for storing a desired configuration of the equipment based on a predictive maintenance target of the item of equipment, wherein the predictive maintenance target includes at least one of a physical configuration objective, a functional configuration objective, a logical configuration objective, and an operational configuration objective;
an actual configuration database for storing an actual configuration of the equipment based on an evaluation of the equipment;
a data processor determining if the actual configuration complies with the desired configuration, the data processor determining an upgrade requirement for upgrading the actual configuration to the desired configuration if the actual configuration is noncompliant. - View Dependent Claims (13, 14, 15, 16, 17, 18, 19, 20)
-
Specification