A SYSTEM AND METHOD FOR MONITORING FACILITY DATA
First Claim
1. A method for monitoring facility data utilizing a computer system comprising:
- inputting information relating to at least one part from at least one input device into the computer system;
inputting information relating to at least one field from the at least one input device into the computer system; and
inputting measurement data from a plurality of measurement devices, wherein the inputted measurement data is at least partially correlated to the information related to the at least one part and the information related to the at least one field.
4 Assignments
0 Petitions
Accused Products
Abstract
A system and method for monitoring facility data is disclosed. This includes at least one processor capable of receiving inputted data and generating alerts or alarms when scheduled activity does not occur, monitoring whether devices used in the facility are calibrated, determining what corrective actions are appropriate if defects occur, provide control over who and how users edit data, provide a pre-shipment review of products leaving a facility, determining disposition of at least one product, developing root causes for defects and scheduling tasks. There is an ability for a wide variety of individuals having access to exactly the same program with material added or blocked-out in terms of zones and data monitoring can be defined in terms of department, lines and processes with complete flexibility in configuration. There are both data collectors and data verifiers with the establishment of schedules and alarms tailored to each role.
53 Citations
47 Claims
-
1. A method for monitoring facility data utilizing a computer system comprising:
-
inputting information relating to at least one part from at least one input device into the computer system;
inputting information relating to at least one field from the at least one input device into the computer system; and
inputting measurement data from a plurality of measurement devices, wherein the inputted measurement data is at least partially correlated to the information related to the at least one part and the information related to the at least one field. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32)
-
-
33. A method for monitoring facility data utilizing a computer system comprising:
-
inputting information relating to at least one part into the computer system;
inputting information relating to at least one field into the computer system;
inputting measurement data from a plurality of measurement devices;
entering and viewing measurement data utilizing at least one workstation; and
evaluating the inputted measurement data from a plurality of measurement devices with the computer system in accordance with at least one predetermined test and providing a notification when the at least one predetermined test fails.
-
-
34. A computer system for monitoring facility data comprising:
-
at least one input device for receiving information relating to at least one part and receiving information relating to at least one field; and
a plurality of measurement devices for receiving measurement data, wherein the inputted measurement data is at least partially correlated to the information related to the at least one part and the information related to the at least one field. - View Dependent Claims (35, 36, 37, 38, 39, 40, 41, 42, 43, 44, 45, 46, 47)
-
Specification