Defibrillators learning of other concurrent therapy
First Claim
1. In a press having a shaft adapted for rotational movement and a cam-operated switchgroup connected to the shaft by means of a connecting member, a method of monitoring failsafe operation of the connecting member, said method comprising the steps of:
- generating, by means of the cam-operated switchgroup, a pulse train comprising a number of successive pulses each separated one from another by an individual time interval, the individual time intervals between successive pulses being dependent on the rotational movement of the shaft, determining a monitoring time period within which an expected next pulse of the pulse train should occur, monitoring whether the expected next pulse actually occurs within the monitoring time period, and generating a control signal if the expected next pulse does not occur within the monitoring time period, wherein the monitoring time period is repeatedly adapted to the individual time intervals.
1 Assignment
0 Petitions
Accused Products
Abstract
A method for the failsafe monitoring of the rotational movement of a shaft comprises a first step of picking up a characteristic pulse train with a number of pulses following one another at successive times, the time interval between the pulses is dependent on the rotational movement. A second step determines a monitoring time period and a third step monitors whether an expected pulse of the pulse train occurs within the monitoring time period. Finally, there is a fourth step of generating a control signal when the expected pulse does not occur within the monitoring time period. The monitoring time period is repeatedly adapted to the time interval of the pulses during monitoring.
-
Citations
12 Claims
-
1. In a press having a shaft adapted for rotational movement and a cam-operated switchgroup connected to the shaft by means of a connecting member, a method of monitoring failsafe operation of the connecting member, said method comprising the steps of:
-
generating, by means of the cam-operated switchgroup, a pulse train comprising a number of successive pulses each separated one from another by an individual time interval, the individual time intervals between successive pulses being dependent on the rotational movement of the shaft, determining a monitoring time period within which an expected next pulse of the pulse train should occur, monitoring whether the expected next pulse actually occurs within the monitoring time period, and generating a control signal if the expected next pulse does not occur within the monitoring time period, wherein the monitoring time period is repeatedly adapted to the individual time intervals. - View Dependent Claims (2, 3, 4, 5)
-
-
6. In a press having a shaft adapted for rotational movement, a method of using a device for shear pin monitoring, said device having a first part for picking up a pulse train comprising a number of successive pulses which are separated one from another by individual time intervals dependent on the rotational movement of the shaft, having a second part for determining a monitoring time period, having a third part for monitoring whether an expected pulse of the pulse train occurs within the monitoring time period, and having a fourth part for generating a control signal when the expected pulse does not occur within the monitoring time period, the second part being configured to repeatedly adapt the monitoring time period to the individual time intervals.
-
7. A method for the failsafe monitoring of the rotational movement of a shaft, comprising the steps of:
-
generating a pulse train with a number of successive pulses separated by individual time intervals which are dependent on the rotational movement of the shaft, determining a monitoring time period within which an expected pulse should occur, monitoring whether the expected pulse occurs within the monitoring time period, and generating a control signal if the expected pulse does not occur within the monitoring time period, wherein the monitoring time period is repeatedly adapted to the rotational movement of the shaft during the monitoring. - View Dependent Claims (8, 9, 10, 11)
-
-
12. A device for the failsafe monitoring of the rotational movement of a shaft, said device having a first part for picking up a characteristic pulse train with a number of successive pulses which are separated by individual time intervals that are dependent on the rotational movement of the shaft, having a second part for determining a monitoring time period, having a third part for monitoring whether an expected pulse in the pulse train occurs within the monitoring time period, and having a fourth part for generating a control signal when the expected pulse does not occur within the monitoring time period, wherein the second part is configured to repeatedly adapt the monitoring time period to the individual time intervals.
Specification