×

Subsea well production flow system

  • US 20050061515A1
  • Filed: 09/14/2004
  • Published: 03/24/2005
  • Est. Priority Date: 09/24/2003
  • Status: Active Grant
First Claim
Patent Images

1. A method of flowing a subsea well, the method comprising the steps of:

  • supplying a multi-phase medium from a subsea tree to a removable separator package;

    separating the multi-phase flow into one or more phases at the desired pressures, the pressure being controlled by one or more pressure control devices on one or more outlets from the separator package; and

    analysing each of the one or more phases to determine the amount and quality of products produced by the well.

View all claims
  • 5 Assignments
Timeline View
Assignment View
    ×
    ×