Method for predicting a development over time of a system quantity
First Claim
1. A method for predicting a development over time of a system quantity (WP, 41, 42, 43, 44, 6) of a system (2), to which a number of system quantities (WP, 41, 42, 43, 44, 6) are assigned, a sequence in each case of one of the system quantities (WP, 41, 42, 43, 44, 6) being characterized by at least one event, comprising detecting a delay of the at least one event and, based on it, calculating at least one actual value (I) over time for at least one event of at least one system quantity (WP, 41, 42, 43, 44, 6) within a measurement time period to be predicted.
1 Assignment
0 Petitions
Accused Products
Abstract
A method for predicting a development over time of a system quantity (WP, 41, 42, 43, 44, 6) of a system (2), to which a number of system quantities (WP, 41, 42, 43, 44, 6) are assigned, a sequence of one of the system quantities (WP, 41, 42, 43, 44, 6) in each case being characterized by at least one event, wherein a delay of the at least one event is detected. On this basis, at least one actual value (I) over time for at least one event of at least one system quantity (WP, 41, 42, 43, 44, 6) is calculated within one measurement period to be predicted. The present invention makes it possible to provide a prediction of the system (2) or of one or a plurality of system quantities (WP, 41, 42, 43, 44, 6) based on flexible measurement periods. A future development of the system (2) or of the at least one system quantity (WP, 41, 42, 43, 44, 6) may not only be estimated roughly but instead may be calculated reliably under consideration of measurable data. The method makes reliable planning for future sequences of the at least one system quantity (WP, 41, 42, 43, 44, 6) and even of the entire system (2) possible.
-
Citations
20 Claims
- 1. A method for predicting a development over time of a system quantity (WP, 41, 42, 43, 44, 6) of a system (2), to which a number of system quantities (WP, 41, 42, 43, 44, 6) are assigned, a sequence in each case of one of the system quantities (WP, 41, 42, 43, 44, 6) being characterized by at least one event, comprising detecting a delay of the at least one event and, based on it, calculating at least one actual value (I) over time for at least one event of at least one system quantity (WP, 41, 42, 43, 44, 6) within a measurement time period to be predicted.
- 15. A device for predicting a development over time of a system quantity (WP, 41, 42, 43, 44, 6) of a system (2), to which a number of system quantities (WP, 41, 42, 43, 44, 6) are assigned, a sequence in each case of one of the system quantities (WP, 41, 42, 43, 44, 6) being characterized by at least one event, comprising at least one electronic device (3) which detects a delay of the at least one event, and at least one electronic computing unit (10) which, based on said delay, calculates at least one actual value (I) over time for at least one event of at least one system quantity (WP, 41, 42, 43, 44, 6) within a measurement time period to be predicted.
Specification