Multidiscipline site development and risk assessment process
First Claim
Patent Images
1. A method for generating a risks assessment for a project, the method comprising the steps of:
- providing a system comprising;
a project database having at least one project, a question database containing at least one question, a risk database containing at least one risk, and a contact database containing at least one contact;
selecting a project from the project database;
answering a question wherein the question relates to a project;
selecting a risk from the risk database related to the answer; and
viewing the risk.
1 Assignment
0 Petitions
Accused Products
Abstract
A software application is provided designed to encourage collaboration between professional disciplines related to land development and construction projects. A graphical risk analysis system is provided based on answers to interdisciplinary questions related to risks. Use of the system promotes a complete checklist of interdisciplinary and informational consultation which, when completed, reduces the risk related to land development.
79 Citations
51 Claims
-
1. A method for generating a risks assessment for a project, the method comprising the steps of:
-
providing a system comprising;
a project database having at least one project, a question database containing at least one question, a risk database containing at least one risk, and a contact database containing at least one contact;
selecting a project from the project database;
answering a question wherein the question relates to a project;
selecting a risk from the risk database related to the answer; and
viewing the risk. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19)
-
-
20. A system for generating a risks assessment for a project, the system comprising:
-
a project database having a project, a question database having a question relating to the project;
a risk database having a risk;
a first dialog mechanism allowing for the selection of the project;
a second dialog mechanism for answering the question;
an association engine for associating the risk with the answer; and
a display for viewing the risk. - View Dependent Claims (21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31)
-
-
32. A system for generating a risks assessment for a project, the system comprising:
-
a project database having a project, a question database having a question;
a risk database having a risk;
a contact database having a contact;
a first dialog box allowing for the selection of a project from the project database;
a second dialog box for answering a question from the question database wherein the question relates to the selected project;
a processor for locating the risk from the risk database wherein the risk is related to the answer, and for locating the contact from the contact database wherein the contact is related to the risk; and
a third dialog box for viewing the risk and the contact. - View Dependent Claims (33, 34, 35, 36, 37, 38, 39)
-
-
40. A system for generating a risks assessment for a project, the system comprising:
-
a project database having a project, a question database having a plurality of questions;
a risk database having a plurality of risks;
a contact database having a plurality of contacts;
a first selection tool allowing for the selection of a project from the project database;
a second selection tool allowing a question from the question database to be answered wherein the question relates to the selected project;
a database processor for locating a risk from the risk database related to the answer, a contact from the contact database related to the risk, and a graphical icon associated with the risk; and
a means for viewing the risk, the contact and the icon. - View Dependent Claims (41, 42, 43, 44, 45, 46, 47)
-
-
48. A method for generating a risks assessment for a project, the method comprising:
-
creating a project database having at least one project;
creating a question database having at least one question with a question ID;
creating a risk database having at lease one risk with a risk ID;
storing the question ID in the project database;
answering the question;
determining a risk ID associated with the answer;
storing the risk ID in the project database; and
displaying a message associated with the risk ID. - View Dependent Claims (49, 50, 51)
-
Specification