Method and apparatus for offline standbuilding
First Claim
1. A system for handling tubular body sections at a drilling site comprising:
- a drill platform having a derrick extending upwards therefrom, the drill platform and derrick defining a drill area;
a first hoist connected to an upper part of the derrick for passing a tubular body through a drilling opening defined in the drill platform;
at least one storage area being arranged within the drill area for storing a plurality of tubular lengths, each of the tubular lengths comprising at least two releasably interconnected tubular body sections;
at least one preparation opening extending through the drill platform at a location spaced from the drilling opening and from the at least one storage area;
a torquing tool for rotatably interconnecting tubular bodies at the at least one preparation opening to form tubular lengths;
a first pipehandling device for transporting tubular bodies and tubular lengths from outside the drill area to the at least one preparation opening; and
a second pipehandling device for transporting tubular lengths between the at least one storage area and the first hoist;
where the first and second pipehandling devices are disposed to allow the direct exchange of tubular lengths therebetween.
1 Assignment
0 Petitions
Accused Products
Abstract
A method and apparatus for moving pipe on a rig floor between a number of different stations are provided. Generally the invention includes pipehandling equipment arranged to interact with an off-floor rack, a preparation opening, a borehole, and a storage area, such that tubulars can be loaded onto the drill floor, prepared at the preparation opening, loaded onto or off of the storage rack, and connected to a drill string while drilling is simultaneously conducted at the borehole. In one embodiment, the system of the current invention comprises at least two pipehandling devices for communicating pipe between a storage area off the drill floor, a storage area on the drill floor, at least one preparation opening, and a drill opening.
33 Citations
37 Claims
-
1. A system for handling tubular body sections at a drilling site comprising:
-
a drill platform having a derrick extending upwards therefrom, the drill platform and derrick defining a drill area;
a first hoist connected to an upper part of the derrick for passing a tubular body through a drilling opening defined in the drill platform;
at least one storage area being arranged within the drill area for storing a plurality of tubular lengths, each of the tubular lengths comprising at least two releasably interconnected tubular body sections;
at least one preparation opening extending through the drill platform at a location spaced from the drilling opening and from the at least one storage area;
a torquing tool for rotatably interconnecting tubular bodies at the at least one preparation opening to form tubular lengths;
a first pipehandling device for transporting tubular bodies and tubular lengths from outside the drill area to the at least one preparation opening; and
a second pipehandling device for transporting tubular lengths between the at least one storage area and the first hoist;
where the first and second pipehandling devices are disposed to allow the direct exchange of tubular lengths therebetween. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13)
-
-
14. A method for manipulating tubular body sections at a drilling site comprising:
-
providing a tubular handling system comprising;
a drill platform having a derrick extending upwards therefrom, the drill platform and derrick defining a drill area, a first hoist connected to an upper part of the derrick for passing a tubular body through a drilling opening defined in the drill platform, at least one storage area being arranged within the drill area for storing a plurality of tubular lengths, each of the tubular lengths comprising at least two releasably interconnected tubular bodies, at least one preparation opening extending through the drill platform at a location spaced from the drilling opening and from the at least one storage area, a torquing tool for rotatably interconnecting tubular bodies at the at least one preparation opening to form tubular lengths, a first pipehandling device for transporting tubular bodies and tubular lengths from outside the drill area to the at least one preparation opening, and a second pipehandling device for transporting tubular lengths between the at least one storage area and the first hoist;
where the first and second pipehandling devices are disposed to allow the direct exchange of tubular lengths therebetween;
transporting a plurality of tubular bodies from outside the drill area to the at least one preparation opening in a substantially vertical position by means of the first pipehandling device;
forming a tubular length by releasably interconnecting the plurality of tubular bodies with the torquing tool, while one of the tubular bodies extends through the preparation opening and another is suspended by means of the first pipehandling device, and withdrawing the prepared tubular length from the preparation opening by means of said first pipehandling device;
exchanging the prepared tubular length between the first and second pipehandling devices in a substantially vertical position;
transporting the prepared tubular length to the at least one storage area in a substantially vertical position by means of said second pipehandling device;
transporting tubular lengths from the storage area to the drilling opening in a substantially vertical position by means of said second pipehandling device, and releasably connecting said tubular lengths to the upper end of a drill stem suspended within the drilling opening with the torquing tool to form a completed drill stand, and successively lowering the drill stand through the drilling opening by means of said first hoist. - View Dependent Claims (15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37)
-
Specification