Please download the dossier by clicking on the dossier button x
×

Resource scheduling and monitoring

  • US 20050137925A1
  • Filed: 10/25/2004
  • Published: 06/23/2005
  • Est. Priority Date: 10/23/2003
  • Status: Abandoned Application
First Claim
Patent Images

1. A computer-implemented resource scheduling system comprising:

  • a set of resources and associated attributes;

    at least one calendar representing dates for resource utilization;

    at least one slot representing demand for one or more individual resource items;

    a set of resource constraints generated based on the at least one calendar and the at least one slot; and

    a scheduling module for generating a schedule of resource utilization that satisfies at least a subset of the resource constraints.

View all claims
  • 0 Assignments
Timeline View
Assignment View
    ×
    ×