Process for checking a laser weld seam
First Claim
1. A process for checking a laser weld seam, comprising:
- detecting characteristic signals from the area of the seam using a sensor and comparing the detected signals with desired values, wherein only signals detected within a characteristic time interval are taken into consideration, which characteristic time interval begins, at the earliest, after the solidification of the seam.
2 Assignments
0 Petitions
Accused Products
Abstract
When laser beam welding one or more work pieces faults may occur, which lead to unacceptable losses in quality. For quality assurance, both subjective visual inspections as well as automated checks of the seam are the norm. In the automated processes the work site is conventionally monitored during welding using point or surface detectors (cameras). This type of process can not detect faults which do not occur until after the actual interaction of laser beam and work piece, in particular, solidification phenomena. Beyond this, certain irregularities relevant to quality are not recognized, since relevant process signals are overridden by stronger signals of the process illumination with no information value. It is the task of the present invention to provide a check process, which reliably recognizes seam faults. This task is solved in a process for checking of the seam which is introduced into one or more workpieces by means of laser beam welding, wherein characteristic signals are detected from the region of the seam using a sensor and compared with an index value or set value, and wherein only signals are taken into consideration which are detected in a characteristic time interval following the laser beam welding, which begins, at the earliest, following the solidification of the seam.
72 Citations
6 Claims
-
1. A process for checking a laser weld seam, comprising:
-
detecting characteristic signals from the area of the seam using a sensor and comparing the detected signals with desired values, wherein only signals detected within a characteristic time interval are taken into consideration, which characteristic time interval begins, at the earliest, after the solidification of the seam. - View Dependent Claims (2, 3, 4, 5, 6)
-
Specification