1. A method comprising:
- opening a battery cell circuit during a first and second time interval, said battery cell circuit comprising a battery cell;
measuring a first instantaneous open circuit voltage level of said battery cell during said first time interval and a second instantaneous open circuit voltage level of said battery cell during said second time interval;
correlating said first instantaneous open circuit voltage level to a first estimated value and said second instantaneous open circuit voltage level to a second estimated value;
correlating said first estimated value to a first relative state of charge level of said battery cell and said second estimated value to a second relative state of charge level of said battery cell; and
calculating a first full capacity level of said battery cell in response to a difference between said first and second relative state of charge levels.
2 Assignments
0 Petitions
Accused Products
Abstract
Full capacity determination in a battery gas gauge. Operations include measuring instantaneous open circuit voltage levels during an open circuit time interval for a specific battery cell and correlating such measurements to estimate values. Such estimated values may then be correlated to associated relative state of charge levels. Finally, a full capacity calculation can be made based on the associated relative state of charge levels. A plurality of full capacity determinations may also be made and compared to each other to assess the reliability of such determinations.
23 Citations
20 Claims
-
1. A method comprising:
-
opening a battery cell circuit during a first and second time interval, said battery cell circuit comprising a battery cell;
measuring a first instantaneous open circuit voltage level of said battery cell during said first time interval and a second instantaneous open circuit voltage level of said battery cell during said second time interval;
correlating said first instantaneous open circuit voltage level to a first estimated value and said second instantaneous open circuit voltage level to a second estimated value;
correlating said first estimated value to a first relative state of charge level of said battery cell and said second estimated value to a second relative state of charge level of said battery cell; and
calculating a first full capacity level of said battery cell in response to a difference between said first and second relative state of charge levels. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
-
8. An electronic device comprising:
a storage medium having stored therein instructions that when executed by a machine result in the following;
opening a battery cell circuit during a first and second time interval, said battery cell circuit comprising a battery cell;
measuring a first instantaneous open circuit voltage level of said battery cell during said first time interval and a second instantaneous open circuit voltage level of said battery cell during said second time interval;
correlating said first instantaneous open circuit voltage level to a first estimated value and said second instantaneous open circuit voltage level to a second estimated value;
correlating said first estimated value to a first relative state of charge level of said battery cell and said second estimated value to a second relative state of charge level of said battery cell; and
calculating a first full capacity level of said battery cell in response to a difference between said first and second relative state of charge levels. - View Dependent Claims (9, 10, 11, 12, 13, 14)
-
15. A battery gas gauge circuit comprising:
-
a switch network for coupling to a plurality of battery cells;
an analog to digital converter (ADC) coupled to said switch network, said ADC adapted to accept an analog signal from each of a plurality of battery cells via said switch network and convert each said analog signal to an associated digital signal; and
a processor capable of executing instructions stored in a storage medium to result in the following;
instructing said switch network to open a battery cell circuit comprising one of said plurality of battery cells during a first and second time interval;
instructing said switch network to couple terminals of said one of said plurality of battery cells to said ADC, said ADC adapted to provide said processor a first digital signal representative of a first instantaneous open circuit voltage level of said battery cell during said first time interval and a second digital signal representative of a second instantaneous open circuit voltage level of said battery cell during said second time interval;
correlating said first digital signal to a first estimated value and said second digital signal to a second estimated value;
correlating said first estimated value to a first relative state of charge level of said battery cell and said second estimated value to a second relative state of charge level of said battery cell; and
calculating a first full capacity level of said battery cell in response to a difference between said first and second relative state of charge levels. - View Dependent Claims (16, 17, 18, 19, 20)
-