×

Methods for measuring a formation supercharge pressure

  • US 20050235745A1
  • Filed: 03/01/2005
  • Published: 10/27/2005
  • Est. Priority Date: 03/01/2004
  • Status: Active Grant
First Claim
Patent Images

1. A method of determining the supercharge pressure in a formation intersected by a borehole having a wall, the method comprising:

  • disposing a formation pressure test tool into the borehole, said formation pressure test tool having a probe for isolating a portion of the borehole;

    extending said probe into sealing contact with the borehole wall;

    performing at least one drawdown test with said formation pressure test tool by drawing formation fluid into a drawdown chamber of said formation pressure test tool and measuring fluid pressure in said drawdown chamber;

    modeling the supercharge pressure of the formation using the dynamic properties of a mudcake on the borehole wall; and

    determining the supercharge pressure of the formation using said supercharge pressure model.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×