Method and apparatus for pre-provisioning networks to support fast restoration with minimum overbuild
First Claim
1. A method of designing a protection capacity to be reserved in a network, the method comprising the steps of:
- obtaining one or more link capacities associated with a network topology, wherein the network is assumed to have no pre-existing working traffic; and
determining a capacity partition for at least one link in the network topology, the capacity partition comprising a working capacity portion and a protection capacity portion, the protection capacity portion being reserved for rerouting working traffic upon a failure, wherein the capacity partition determination step enables control over the number of backup tunnels, associated with the at least one link, on which working traffic can be rerouted, and further wherein the capacity partition determination step substantially guarantees at least one of a minimal failure restoration time and a minimal overbuild.
8 Assignments
0 Petitions
Accused Products
Abstract
Improved network design techniques are provided. More particularly, the invention provides network design techniques for pre-provisioning networks to support fast restoration with minimum overbuild. In one aspect of the invention, a technique for designing a protection capacity to be reserved in a network comprises the following steps/operations. One or more link capacities associated with a network topology are obtained, wherein the network is assumed to have no pre-existing working traffic. A capacity partition is determined for at least one link in the network topology, the capacity partition comprising a working capacity portion and a protection capacity portion, the protection capacity portion being reserved for rerouting working traffic upon a failure. The capacity partition determination step/operation enables control over the number of backup tunnels, associated with the at least one link, on which working traffic can be rerouted. Further, the capacity partition determination step/operation substantially guarantees at least one of a minimal failure restoration time and a minimal overbuild. A minimal overbuild may comprise an overbuild equivalent to no more than two times an overbuild required for an optimal solution.
-
Citations
23 Claims
-
1. A method of designing a protection capacity to be reserved in a network, the method comprising the steps of:
-
obtaining one or more link capacities associated with a network topology, wherein the network is assumed to have no pre-existing working traffic; and
determining a capacity partition for at least one link in the network topology, the capacity partition comprising a working capacity portion and a protection capacity portion, the protection capacity portion being reserved for rerouting working traffic upon a failure, wherein the capacity partition determination step enables control over the number of backup tunnels, associated with the at least one link, on which working traffic can be rerouted, and further wherein the capacity partition determination step substantially guarantees at least one of a minimal failure restoration time and a minimal overbuild. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11)
-
-
12. Apparatus for designing a protection capacity to be reserved in a network, comprising:
-
a memory; and
at least one processor coupled to the memory and operative to;
(i) obtain one or more link capacities associated with a network topology, wherein the network is assumed to have no pre-existing working traffic; and
(ii) determine a capacity partition for at least one link in the network topology, the capacity partition comprising a working capacity portion and a protection capacity portion, the protection capacity portion being reserved for rerouting working traffic upon a failure, wherein the capacity partition determination step enables control over the number of backup tunnels, associated with the at least one link, on which working traffic can be rerouted, and further wherein the capacity partition determination step substantially guarantees at least one of a minimal failure restoration time and a minimal overbuild. - View Dependent Claims (13, 14, 15, 16, 17, 18, 19, 20, 21, 22)
-
-
23. An article of manufacture for designing a protection capacity to be reserved in a network, comprising a machine readable medium containing one or more programs which when executed implement the steps of:
-
obtaining one or more link capacities associated with a network topology, wherein the network is assumed to have no pre-existing working traffic; and
determining a capacity partition for at least one link in the network topology, the capacity partition comprising a working capacity portion and a protection capacity portion, the protection capacity portion being reserved for rerouting working traffic upon a failure, wherein the capacity partition determination step enables control over the number of backup tunnels, associated with the at least one link, on which working traffic can be rerouted, and further wherein the capacity partition determination step substantially guarantees at least one of a minimal failure restoration time and a minimal overbuild.
-
Specification