Planning and scheduling modification of a configuration
First Claim
1. A method of planning modification of a configuration of an item of equipment, the method comprising:
- tracking planning factors relevant to a modification of a configuration of the item;
arranging a balanced configuration modification plan and schedule based on the planning factors;
deciding whether to institute the balanced configuration plan or at least a portion of the balanced configuration plan; and
allocating at least one of manpower, facilities, components, and tooling consistent with the balanced configuration plan.
2 Assignments
0 Petitions
Accused Products
Abstract
A method and system of planning modification of a configuration of an item of equipment supports an integrated approach toward managing one or more configuration modifications and planning and scheduling issues. Planning factors are tracked. One or more planning factors are relevant to a modification of a configuration of an item of equipment. A balanced configuration modification plan and schedule is arranged based on the planning factors. It is decided whether to institute the balanced configuration plan or at least a portion of the balanced configuration plan. The resources to carry out the balanced configuration plan are allocated.
88 Citations
21 Claims
-
1. A method of planning modification of a configuration of an item of equipment, the method comprising:
-
tracking planning factors relevant to a modification of a configuration of the item;
arranging a balanced configuration modification plan and schedule based on the planning factors;
deciding whether to institute the balanced configuration plan or at least a portion of the balanced configuration plan; and
allocating at least one of manpower, facilities, components, and tooling consistent with the balanced configuration plan. - View Dependent Claims (2, 3, 5, 6)
-
-
4. The method of planning according to claim I wherein the tracking comprises maintaining traceability data as one of the planning factors that tracks changes to an item on a real-time basis to allow visibility to different users to promote coordination and error reduction in the modification process.
-
7. A method of planning modification of a configuration of an item of equipment, the method comprising:
-
establishing a time interval for revision of a configuration to obtain a target configuration;
providing a primary component identifier and a secondary component identifier as an alternate to the primary component identifier, the primary component identifier and the secondary component identifier being compatible with the target configuration;
tracking an item availability date for the revision of the subject item based on at least one of a planned usage of the subject item and other maintenance activity for the subject item;
tracking a revision availability of a revision-supporting device for supporting at least one of testing and installing the revision of a configuration of the subject item;
tracking component availability of the primary component and the secondary component;
selecting one of the primary component and the secondary component based on the temporal coinciding of the item availability, revision availability, and component availability;
tracking the worker availability of a qualified worker to perform the revision; and
scheduling the revision of the subject item at a revision area based on the item availability, the revision availability, the component availability, and the worker availability within the time interval. - View Dependent Claims (8, 9, 10, 11, 12, 13, 14)
-
-
15. A method of planning modification to multi-dimensioned configurations of an item of equipment, the method comprising:
-
updating at least one configuration record concerning the item;
accessing the at least one configuration record to establish reference performance data for the item;
comparing the reference performance data of the item to observed performance data;
planning modification to the item when the observed performance data is noncompliant with the reference performance data for the item. - View Dependent Claims (16, 17, 18, 19, 20, 21)
-
Specification