Monitoring system for concrete pilings and method of installation
First Claim
1. A method of forming a piling with wireless monitoring cababilities, comprising placing strands in a piling form;
- inserting a sensor package between the strands to position sensors of the sensor package in a piling core area;
placing at least one antenna in the form so that the antenna is located on at least one side of the piling near a top of the piling and at least one radio transmitter associated with the antennas;
connecting the sensor package to at least one of the antennas using wires or cable; and
casting concrete in the piling form to embed the sensor package and the antennas.
2 Assignments
0 Petitions
Accused Products
Abstract
A system for tracking and monitoring data related to the manufacture, installation and/or life cycle of concrete structures, such as pilings, as well as related system components and methods for tracking, storing and accessing such data is provided. The system utilizes one or more embeddable antenna assemblies as well as sensor packages that are installed in the concrete structure form before casting. The antenna(s) provide wireless communication of the data from the structure. On board memory is also provided to store structure related data with the structure. A system for tracking a pile during driving is also provided.
28 Citations
27 Claims
-
1. A method of forming a piling with wireless monitoring cababilities, comprising
placing strands in a piling form; -
inserting a sensor package between the strands to position sensors of the sensor package in a piling core area;
placing at least one antenna in the form so that the antenna is located on at least one side of the piling near a top of the piling and at least one radio transmitter associated with the antennas;
connecting the sensor package to at least one of the antennas using wires or cable; and
casting concrete in the piling form to embed the sensor package and the antennas. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9)
-
-
10. An antenna assembly for wet installation in a concrete structure, comprising:
-
an antenna having a length of at least λ
/4; and
a reflector having at least one wall located approximately λ
/4 to λ
/6 from the antenna, the reflector forming a cavity in which the antenna is located. - View Dependent Claims (11, 12, 13, 14)
-
-
15. A suspension assembly for positioning at least one sensor between strands in a concrete structure, comprising:
-
first and second U-shaped frames connected to one another;
at least one hook located on each of the U-shaped frames facing away from one another and adapted to engage opposing reinforcement strands or bars of a concrete structure; and
a slidable carrier attached to the frames for supporting at least one gauge. - View Dependent Claims (16, 17, 18)
-
-
19. A method of monitoring pilings, comprising:
-
inserting a sensor package between strands or reinforcements in a piling form to position sensors in a core area of a piling;
casting the piling;
driving the piling and obtaining data from the sensor package during driving; and
at least one of monitoring the data obtained from the sensor package during driving and monitoring and using the data during the driving to adjust driving parameters for the pile. - View Dependent Claims (20, 21, 22, 23, 24, 25, 26)
-
-
27. A method of automatically tracking piling drive data, comprising:
-
tracking a number of blows through data transmitted from a sensor package including at least one of an accelerometer and a strain gauge in a piling;
tracking a height of the piling above a reference height using a laser lidar which tracks a reference marker on a top of the piling or through differential barometric pressure between altimeters located at the top of the piling and the reference height.
-
Specification