Method and apparatus for load reduction in an electric power system
First Claim
1. A system for load control in an electrical power system, comprising:
- a thermostat configured to control a cooling system;
a data interface device provided to said thermostat, said data interface device configured to receive commands, said data interface device addressable using an identification code, said data interface device comprising one or more sensors to measure one or more physical characteristics of operation of a refrigerant cycle in said cooling system and a processor configured to compute an operating efficiency of said cooling system at least in part using data from said one or more sensors; and
a remote monitoring system, said remote monitoring system configured to send a first command to said data interfaced device to adjust loading on said electrical power system.
7 Assignments
0 Petitions
Accused Products
Abstract
A system for load control in an electrical power system is described, wherein one or more data interface devices are provided to a cooling system. The data interface devices are configured to receive commands for controlling the cooling system. A remote monitoring system, such as a monitoring system operated by a power company or a power transmission company sends one or more commands to the data interfaced devices to adjust loading on the electrical power system. In one embedment, the monitoring system sends shutdown commands. In one embedment, the monitoring system sends commands to tell a compressor in the cooling system to operate in a relatively low-speed mode. In one embedment, the monitoring system sends tell the compressor and/or the cooling system to operate in a relatively low-power mode. In one embodiment, the commands are time-limited, thereby allowing the cooling system to resume normal operation after a specified period of time. In one embodiment, the commands include query commands to cause the cooling system to report operating characteristics (e.g., efficiency, time of operation, etc.) back to the monitoring center.
117 Citations
44 Claims
-
1. A system for load control in an electrical power system, comprising:
-
a thermostat configured to control a cooling system;
a data interface device provided to said thermostat, said data interface device configured to receive commands, said data interface device addressable using an identification code, said data interface device comprising one or more sensors to measure one or more physical characteristics of operation of a refrigerant cycle in said cooling system and a processor configured to compute an operating efficiency of said cooling system at least in part using data from said one or more sensors; and
a remote monitoring system, said remote monitoring system configured to send a first command to said data interfaced device to adjust loading on said electrical power system. - View Dependent Claims (2, 3, 4, 5, 6, 7, 8, 9, 10, 11)
-
-
12. A system for load control in an electrical power system, comprising:
-
a cooling system comprising an evaporator unit;
a data interface device provided to said evaporator unit, said data interface device configured to receive commands over said electrical power system; and
a remote monitoring system, said remote monitoring system configured to send a first command to said data interfaced device to adjust loading on said electrical power system based on a measurement of an efficiency of a refrigerant cycle in said cooling system. - View Dependent Claims (13, 14, 15, 16, 17, 18, 19, 20, 21, 22)
-
-
23. A system for load control in an electrical power system, comprising:
-
a cooling system condenser unit;
a compressor provided to said condenser unit;
a data interface device provided to said condenser unit, said data interface device configured to receive commands over said electrical power system; and
a remote monitoring system configured to measurement an efficiency of a refrigerant cycle in said cooling system, said remote monitoring system configured to send a first command to said data interfaced device to adjust loading on said electrical power system based on said efficiency such that relatively more efficient systems are given preference over relatively less efficient systems. - View Dependent Claims (24, 25, 26, 27, 28, 29, 30, 31, 32, 33)
-
-
34. A system for load control in an electrical power system, comprising:
-
a cooling system comprising;
an evaporator unit;
a condenser unit;
a thermostat; and
one or more data interface devices provided to said cooling system, said data interface devices configured to receive commands and to monitor an efficiency of said cooling system using data from one or more sensors; and
a remote monitoring system, said remote monitoring system configured to send a first command to said data interfaced devices to adjust loading on said electrical power system wherein said cooling system is given a power allocation preference when said cooling system is operating relatively more efficiently than other cooling systems serviced by said electrical power system. - View Dependent Claims (35, 36, 37, 38, 39, 40, 41, 42, 43, 44)
-
Specification