Method and system between subnetwork operation and full network operation
First Claim
1. A method for changing over a serially networked system (100), in particular a serial databus system, from subnetwork operation (1), in which at least one node (22, 28) and/or at least one user (32, 38) of the system (100) is in a state of reduced current consumption and is not addressed and/or not activated by the signal level (40, 42, 44) of the data traffic on the system (100), to fill network operation (G), in which all the nodes (20, 22, 24, 26, 28) and/or all the users (30, 32, 34, 36, 38) of the system (100) are addressed and/or activated by the signal level (46, 48) of the data traffic on the system (100), characterized in that the system (100) is changed over from subnetwork operation (T) to fill network operation (G) if a signal rest level (50) and/or no change in the signal level is noted on the system (100) for a period (Δ
- t) which is greater than a critical period (Δ
tk) of definable or settable length.
1 Assignment
0 Petitions
Accused Products
Abstract
In order further to develop a method for changing over a serially networked system (100), in particular a serial databus system, from subnetwork operation (T), in which at least one node (22, 28) and/or at least one user (32, 38) of the system (100) is in a state of reduced current consumption and is not addressed and/or not activated by the signal level (40, 42, 44) of the data traffic on the system (100), to full network operation (G), in which all the nodes (20, 22, 24, 26, 28) and/or all the users (30, 32, 34, 36, 38) of the system (100) are addressed and/or activated by the signal level (46, 48) of the data traffic on the system (100), together with a corresponding system (100) in such a way that the nodes (22, 28) and/or the users (32, 38) in the network, i.e. on the databus (10), may be simply yet effectively woken, it is proposed that the system (100) be changed over from subnetwork operation (T) to full network operation (G) if a signal rest level (50) and/or no change in the signal level is noted on the system (100) for a period (Δt) which is greater than a critical period (Δtk) of definable or settable length.
-
Citations
15 Claims
-
1. A method for changing over a serially networked system (100), in particular a serial databus system, from subnetwork operation (1), in which at least one node (22, 28) and/or at least one user (32, 38) of the system (100) is in a state of reduced current consumption and is not addressed and/or not activated by the signal level (40, 42, 44) of the data traffic on the system (100), to fill network operation (G), in which all the nodes (20, 22, 24, 26, 28) and/or all the users (30, 32, 34, 36, 38) of the system (100) are addressed and/or activated by the signal level (46, 48) of the data traffic on the system (100), characterized in that the system (100) is changed over from subnetwork operation (T) to fill network operation (G) if a signal rest level (50) and/or no change in the signal level is noted on the system (100) for a period (Δ
- t) which is greater than a critical period (Δ
tk) of definable or settable length. - View Dependent Claims (2, 3, 9, 10, 11, 12, 13, 14, 15)
- t) which is greater than a critical period (Δ
-
4. A serially networked system (100), which is intended to be changed over from subnetwork operation (T), in which at least one node (22, 28) and/or at least one user (32, 38) of the system (100) is in a state of reduced current consumption and cannot be addressed and/or activated by the signal level (40, 42, 44) of the data traffic on the system (100), to full network operation (G), in which all the nodes (20, 22, 24, 26, 28) and/or all the users (30, 32, 34, 36, 38) of the system (100) may be addressed and/or activated by the signal level (46, 48) of the data traffic on the system (100), characterized in that the changeover from subnetwork operation (T) to full network operation (G) takes place if the system (100) is in the signal rest level (50) state and/or an unchanged signal level state for a period (Δ
- t) which is greater than a critical period (Δ
tk) of definable or settable length. - View Dependent Claims (5, 6, 7, 8)
- t) which is greater than a critical period (Δ
Specification