×

Method and system for estimating the amount of supercharging in a formation

  • US 20060129365A1
  • Filed: 10/20/2005
  • Published: 06/15/2006
  • Est. Priority Date: 10/22/2004
  • Status: Active Grant
First Claim
Patent Images

1. A method for estimating the amount of supercharging in a formation penetrated by a wellbore, the method comprising the steps of:

  • obtaining measurements of pressure fluctuations at a position in the formation accessible from the well bore and at an adjacent position in the wellbore;

    providing a formation flow model which relates variations in pressure with time at said positions to a plurality of adjustable parameters from which the amount of supercharging can be estimated, at least one of the parameters accounting for the influence on fluid flow of a wellbore filtercake layer and/or the influence on fluid flow of the formation;

    adjusting the parameters to optimise the fit between the pressure variations predicted by the model and the measured pressure fluctuations; and

    estimating the amount of supercharging from the parameters thus-adjusted.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×