Erosion control device
First Claim
1. An erosion control device for constructing an erosion control wall comprising:
- a loading box for holding a filler material, the loading box having a material hopper, a filling chute and an implement attachment interface, the loading box further including a rotatable beater assembly and a rotatable compacter assembly driven by a drive assembly wherein the rotatable beater assembly rotates through the filler material so as to allow the filler material to flow into the rotatable compacter assembly and wherein the rotatable compacter assembly fills an erosion control bag attached to the filling chute.
1 Assignment
0 Petitions
Accused Products
Abstract
Methods and apparatus related to an erosion control device for constructing a barrier bag for use in areas where erosion is likely to occur. The erosion control device can include an attachment member allowing the erosion control device to be operably mounted to a skid steer, front-end loader, tractor or similar vehicle for transportation and power. The erosion control device can include a loading box defining a material hopper for holding a filler material. The loading box can further comprise a beater bar assembly for agitating the filler material within the material hopper so as to continually feed an auger assembly within the loading box. The auger assembly transports and compacts the filler material within a filling chute. The compacted filler material exits the filling chute and enters into a barrier bag that is continually deployed from the filling chute.
22 Citations
20 Claims
-
1. An erosion control device for constructing an erosion control wall comprising:
a loading box for holding a filler material, the loading box having a material hopper, a filling chute and an implement attachment interface, the loading box further including a rotatable beater assembly and a rotatable compacter assembly driven by a drive assembly wherein the rotatable beater assembly rotates through the filler material so as to allow the filler material to flow into the rotatable compacter assembly and wherein the rotatable compacter assembly fills an erosion control bag attached to the filling chute. - View Dependent Claims (2, 3, 4, 5, 6, 7)
-
8. An erosion control system comprising:
-
a loading box having a material hopper, a filling chute and an implement attachment interface, the loading box further including a means for agitating a filler material within the loading box, a means for filling an erosion control bag, and a means for driving the agitating means and the filling means, wherein the means for agitating the filler material promotes flow of the filler material into the means for filling and where the mean for filling compacts the filler material through the filling chute and into an erosion control bag; and
a transport vehicle having an engagement member adapted for coupling to the implement attachment interface, the transport vehicle adapted to carry the loading box so as to direct placement of a filled erosion control bag. - View Dependent Claims (9, 10, 11, 12, 13, 14)
-
-
15. A method for constructing a temporary erosion control wall comprising:
-
loading a material loading box with a filler material;
attaching a continuous bag to a filler chute on a material loading box, the continuous bag having an open end and a closed end, the open end being retainably positioned and gathered over the filler chute such that the closed end is proximate a chute opening; and
compacting the filler material into the filler chute such that a compacted filler material is advanced through the filler chute and into the continuous bag, the compacted filler material contacting the closed end where a filled bag deploys from the filler chute. - View Dependent Claims (16, 17, 18, 19, 20)
-
Specification