×

Methods for managing capacity

  • US 20060161884A1
  • Filed: 01/18/2005
  • Published: 07/20/2006
  • Est. Priority Date: 01/18/2005
  • Status: Active Grant
First Claim
Patent Images

1. A method of instructing at least one operator in a best practices implementation of a process for managing resource capacity in an information technology (IT) environment, the method comprising providing instructions to the at least one operator to perform acts of:

  • (A) creating at least one model of at least some aspects of the IT environment;

    (B) analyzing the at least one model to determine cost information relating to the modeled IT environment;

    (C) applying at least one simulated use condition to the at least one model;

    (D) analyzing performance of the at least one model under the at least one simulated use condition to determine information relating to at least a utilization of resources in the modeled IT environment and to determine resources in the modeled IT environment that create performance bottlenecks in the modeled IT environment; and

    (E) modifying at least one aspect of the at least one model impacting resource capacity based on the information determined in (B) and/or (D).

View all claims
  • 2 Assignments
Timeline View
Assignment View
    ×
    ×