Method and apparatus for congestion management
First Claim
1. A method of managing congestion in a railway system having a network of track and a plurality of trains scheduled to traverse the rail network comprising:
- (a) detecting congestion along the rail network and identifying a first train involved in the congestion;
(b) identifying a back-off area surrounding the congestion;
(c) selecting a safe spot outside the back-off are for a second train that was previously planned to enter the back-off area;
(d) plan the movement of the second train to the safe spot;
(e) identify alternative resources available to alleviate congestion; and
(f) plan the movement of the first train using the identified alternative resources.
1 Assignment
0 Petitions
Accused Products
Abstract
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system. Deadlock is avoided by controlling the entry of trains into congested areas, and may be automatically implemented by the use of traffic flow analysis algorithms.
-
Citations
6 Claims
-
1. A method of managing congestion in a railway system having a network of track and a plurality of trains scheduled to traverse the rail network comprising:
-
(a) detecting congestion along the rail network and identifying a first train involved in the congestion;
(b) identifying a back-off area surrounding the congestion;
(c) selecting a safe spot outside the back-off are for a second train that was previously planned to enter the back-off area;
(d) plan the movement of the second train to the safe spot;
(e) identify alternative resources available to alleviate congestion; and
(f) plan the movement of the first train using the identified alternative resources. - View Dependent Claims (2, 3, 5, 6)
-
-
4. A method of managing congestion in a railway system having a network of track and a plurality of trains scheduled to traverse the rail network comprising:
-
(a) detecting congestion detecting congestion along the rail network;
(b) selecting a train that is approaching the congestion; and
(c) rescheduling the selected train to delay the train at a selected location at a predetermined distance from the congestion;
wherein the selected location is an area where other trains may pass along the rail network.
-
Specification