System and method for determining correct sign of response of an adaptive controller
First Claim
Patent Images
1. A method comprising:
- receiving, by an adaptive controller, performance measurement for a computing system;
estimating a performance model for use by said adaptive controller;
determining whether the estimated performance model has a correct sign for approaching performance desired for said computing system;
when determined that the estimated performance model has an incorrect sign, said adaptive controller taking action to determine a performance model having a correct sign for approaching performance desired for said computing system.
2 Assignments
0 Petitions
Accused Products
Abstract
According to one embodiment, a method comprises receiving, by an adaptive controller, performance measurement for a computing system. The method further comprises estimating a performance model for use by the adaptive controller, and determining whether the estimated performance model has a correct sign for approaching performance desired for the computing system. When determined that the estimated performance model has an incorrect sign, the adaptive controller takes action to determine a performance model having a correct sign for approaching performance desired for the computing system.
-
Citations
26 Claims
-
1. A method comprising:
-
receiving, by an adaptive controller, performance measurement for a computing system;
estimating a performance model for use by said adaptive controller;
determining whether the estimated performance model has a correct sign for approaching performance desired for said computing system;
when determined that the estimated performance model has an incorrect sign, said adaptive controller taking action to determine a performance model having a correct sign for approaching performance desired for said computing system. - View Dependent Claims (2, 3, 5, 6, 7, 8, 9, 10)
-
-
11. A method comprising:
-
receiving, by an adaptive controller, performance measurement for a computing system;
estimating, based at least in part on said received performance measurement, a plurality of different performance models;
identifying at least one of said estimated performance models having a correct sign for approaching performance desired for said computing system; and
using one of said at least one identified performance models for determining a responsive action for said adaptive controller to take in response to said received performance measurement. - View Dependent Claims (12, 13, 14)
-
-
15. A system comprising:
-
a computing system; and
an adaptive controller operable to monitor performance of said computing system and take responsive action to manage performance of said computing system, wherein said adaptive controller comprises a) a model estimator for estimating at least one performance model based at least in part on said monitored performance;
b) a control law for setting an actuator, based on an estimated performance model, in attempt to achieve desired performance for said computing system; and
c) logic for controlling a sign of said estimated performance model used by said control law for setting said actuator, wherein said logic for controlling maintains a correct sign for said estimated performance model for approaching performance desired for said computing system even when said monitored performance is impacted by an external event that is not accounted for in said estimated performance model. - View Dependent Claims (16, 17, 18, 19, 20, 21)
-
-
22. An adaptive controller comprising:
-
a model estimator for estimating at least one performance model based at least in part on a performance measurement received for a computing system;
a control law for setting an actuator of said computing system, based on an estimated performance model, for managing performance of said computing system; and
logic for controlling a sign of said estimated performance model used by said control law for setting said actuator to maintain said sign correct for approaching performance desired for said computing system even when said performance measurement is impacted by an external event that is not accounted for in said estimated performance model. - View Dependent Claims (23, 24, 25, 26)
-
Specification