×

Resource capacity planning

  • US 20070073576A1
  • Filed: 09/29/2005
  • Published: 03/29/2007
  • Est. Priority Date: 09/29/2005
  • Status: Abandoned Application
First Claim
Patent Images

1. A method comprising:

  • identifying future resource requirements as determined by ongoing work engagements, future planned work projects, and future proposed work projects;

    creating a demand plan based on the future resource requirements;

    creating a supply statement that is determined by a predicted future resource supply;

    comparing the supply statement with the demand plan to conduct and develop a preliminary capacity statement;

    preparing a resource plan to mitigate excesses and shortages of labor as described by the preliminary capacity statement;

    specifying resource actions in a tactical time frame to reduce gaps in sources of future laborers;

    creating a final capacity statement based on an execution of the resource actions;

    tracking an accuracy of the final capacity statement based on a success of a job project in being supplied with a proper quantity of qualified workers; and

    modifying the demand plan, resource plan, preliminary capacity statement, and final capacity statement according to the accuracy of the final capacity statement.

View all claims
  • 1 Assignment
Timeline View
Assignment View
    ×
    ×