Schedule coordinates method for project scheduling
First Claim
1. A method of scheduling a project consisting of related tasks, said method comprising the step of generating a coordinate reference construction.
0 Assignments
0 Petitions
Accused Products
Abstract
A method is provided for generating feasible schedule for project consisting of related tasks. Project may contain tasks with given duration and tasks with given volume. Splitting may be allowed for some of tasks with given duration. Constraints are given that may include resource constraints. Method uses schedule coordinates for representing states of tasks executing and splitting. Method comprises schedule vectors generating. The constraints are checked when the schedule vectors are being generated. Effectiveness criteria may be used for decreasing number of schedule vectors and, consequently, of amount of calculations.
15 Citations
20 Claims
- 1. A method of scheduling a project consisting of related tasks, said method comprising the step of generating a coordinate reference construction.
- 6. A method of scheduling a project consisting of related tasks, said method comprising the step of generating, checking and eliminating schedule vectors.
Specification